127EAW26Q0020 - Pinyon Canyon Barracks Replacement

SOL #: 127EAW26Q0020Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 6
Albuquerque, NM, 871023498, United States

Place of Performance

Santa Maria, CA

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Construction Of Other Residential Buildings (Y1FZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 20, 2026
2
Submission Deadline
Jun 17, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for the Pinyon Canyon Barracks Replacement project (Solicitation #127EAW26Q0020). This Total Small Business Set-Aside opportunity involves the removal and disposal of an existing fire station mobile home-style barracks and its replacement with a new wildland urban interface (WUI) rated, barracks-style mobile home, including utility connections. The estimated project magnitude is between $100,000 and $250,000. Quotes are due by June 17th, 2026, 10:00 AM Pacific Time.

Scope of Work

The project requires the removal and disposal of the current barracks and the installation of a new WUI-rated, barracks-style mobile home (AAA Pacific Manufactured Homes, Model 5828-4CIK-2B-CATH, approx. 1352 sq ft, 4 bed/2 bath) at the Pine Canyon Fire Station in Santa Maria, CA. This includes reconnecting and testing existing utilities (electrical, water, sewer, phone, internet), installing new OSHA-compliant access stairs and landings, and minimizing ground disturbance. The new mobile home must meet California zone 3 specifications.

Contract Details

  • Contract Type: Firm Fixed Price
  • Estimated Project Magnitude: Between $100,000 and $250,000
  • Period of Performance: 60 calendar days after Notice to Proceed (NTP), commencing within 10 days of NTP.
  • Place of Performance: Pine Canyon Fire Station, 8145 CA-166, Santa Maria, CA 93454.
  • NAICS Code: 238160 - All Other Specialty Trade Contractors (Small Business Size Standard: $19M)
  • Bonds: Performance and payment bonds are required.
  • Wage Rates: Davis-Bacon Act wage rates apply (General Decision Number CA20260014 for Santa Barbara County).

Eligibility & Evaluation

  • Set-Aside: Total Small Business Set-Aside.
  • License Requirement: Offerors must hold an active and valid California Class B contractor's license.
  • Evaluation Criteria: Award will be made to the offeror representing the most advantageous procurement to the Government, based on Technical Approach, Contractor's License, and Past Performance. Price will be evaluated for fairness and reasonableness after the highest technically rated offeror is identified. Award will not necessarily be made to the lowest-priced offeror.

Key Dates & Actions

People

Points of Contact

Greg CunninghamPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 20, 2026
127EAW26Q0020 - Pinyon Canyon Barracks Replacement | GovScope