127EAX26Q0016 Nogales Waterline Connection - Coronado NF

SOL #: 127EAX26Q0016Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 7
Albuquerque, NM, 871023498, United States

Place of Performance

Nogales, AZ

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Repair Or Alteration Of Water Supply Facilities (Z2NE)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 13, 2026
2
Last Updated
Apr 3, 2026
3
Submission Deadline
Apr 10, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for the Nogales Waterline Connection project (Solicitation 127EAX26Q0016) at the Coronado National Forest in Nogales, Arizona. This project involves extending a new 6-inch potable waterline to connect the Nogales Ranger Station to the Valle Verde Water Company, replacing the existing well as the primary water source. This acquisition is a Total Small Business Set-Aside. Offers are due by April 10, 2026, 1:00 PM Pacific Time.

Scope of Work

The project requires the installation of approximately 115 lineal feet of new 6-inch potable waterline, connecting it to both the existing Nogales Ranger Station distribution system and the Valle Verde Water Company main. Key tasks include:

  • Replacing the existing 1-inch water meter with a new 6-inch meter.
  • Capping and abandoning sections of the existing waterline, well, and water treatment building.
  • Installing cross-connection control devices (e.g., 2-inch Double Check Valve Assembly), a 2-inch air release valve, and a 2-inch post flushing hydrant.
  • Removing and replacing existing fencing that crosses the new waterline installation.
  • An Optional Bid Item for the installation of a 6-inch Reduced Pressure Principle Zone (RPZ) assembly, including an enclosure. Contractors are responsible for obtaining all necessary permits, performing as-builts if mandated by permitting, and conducting PFAS flushing and sampling as per ADEQ requirements.

Contract & Timeline

  • Contract Type: Combined Synopsis/Solicitation (RFQ), anticipated Firm-Fixed-Price.
  • Period of Performance: 60 calendar days from Notice to Proceed.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 237110 (Water and Sewer Line and Related Structure Construction), with a $45M size standard.
  • Site Visit: March 27, 2026, 10:00 AM Pacific Time at Nogales Ranger Station, 303 Old Tucson Road, Nogales, Arizona.
  • Questions Due: March 30, 2026, 3:00 PM Pacific Time.
  • Offers Due: April 10, 2026, 1:00 PM Pacific Time.

Submission & Evaluation

Offers must be emailed to the Contracting Officer, Blaine Greenwalt (blaine.greenwalt@usda.gov), with the solicitation number included in the document name. Proposals must contain the company name, Point of Contact (POC), email, UEI #, and TAX ID #. Pricing information must be included for all items as detailed in the Schedule of Items. Award will be made to the offeror representing the best value, based on evaluation of Technical Approach, Past Performance, and Price. Offerors must have an active entity registration at SAM.gov.

Additional Notes

This is a new contract requirement with no incumbent. Bidders must adhere to the "CORONADO FIRE PLAN" outlining fire prevention and suppression requirements. A General Decision Number for wage determination in Arizona (Santa Cruz County) is provided, establishing minimum wage rates and fringe benefits. Clarifications confirm the Valle Verde Water System contact is Southwestern Utilities (520-623-5172) and that the contractor is not responsible for fire flow requirements.

People

Points of Contact

Blaine GreenwaltPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 19, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 18, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 13, 2026
View
127EAX26Q0016 Nogales Waterline Connection - Coronado NF | GovScope