12AF - Secure / Electronic Door Access (Vindicator)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The 12th Air Force is soliciting quotes for Secure / Electronic Door Access (Vindicator) systems at Davis-Monthan AFB, AZ. This Women-Owned Small Business (WOSB) Set-Aside requires the purchase, installation, programming, and testing of Honeywell-Vindicator Integrated Access Control components. Quotes are due April 6, 2026.
Scope of Work
The contractor will provide all labor, transportation, materials, and equipment to:
- Install, program, and test Honeywell-Vindicator Integrated Access Control components.
- Integrate these components as a subsystem to the existing Vindicator Intrusion Detection System (IDS).
- Ensure seamless communication with existing IDS/ACS Badge Manager and Enrollment System(s) over the specified network infrastructure.
Contract Details
- Type: Firm-Fixed Price (FFP)
- Set-Aside: Women-Owned Small Business (WOSB) Set-Aside (NAICS 561621, Size Standard $25M)
- Place of Performance: Davis-Monthan Air Force Base (DMAFB), Tucson, AZ.
- Special Requirements: Contractor must be a certified installer of Honeywell-Vindicator products and familiar with DMAFB's communication infrastructure. Personnel require background checks (LEADS) and must comply with REAL ID Act of 2005. Escorts will be provided for controlled/restricted areas.
- Justification: This is a Brand Name Only procurement due to compatibility requirements with existing US Air Force IDS equipment and proprietary Honeywell-Vindicator technology.
Key Dates
- Site Visit: March 17, 2026, 11:30 AM PDT (Base access requests by March 16, 2026, 2:00 PM PDT).
- Questions Due: March 18, 2026, 5:00 PM PDT.
- Quotes Due: April 6, 2026, 1:00 PM PDT.
- Published: March 27, 2026.
Evaluation Factors
Quotes will be evaluated based on:
- Evidence of Vindicator Certification
- Technical Acceptability
- Project Completion Timeline
- Price Past performance will not be evaluated.
Attachments
Key documents include the Statement of Work (SOW), Justification for Brand Name Only (JA-BNO), Wage Determination 2015-5473, Provisions and Clauses, and a Map to Bldg. 70.
Contact
Jeffrey Dreyer, jeffrey.dreyer@us.af.mil, (520) 228-1922.