16--INERTIAL NAVIGATION, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support (NAVSUP WSS), has issued a Request for Quote (RFQ) for the repair and modification of Inertial Navigation systems. This opportunity seeks contractors to provide comprehensive repair, testing, inspection, overhaul, and upgrade services for NSN 1680 016211302, P/N 79799350-019. The Small Business Administration has determined that a set-aside is not applicable for this procurement. Quotes are due by June 15, 2026.
Scope of Work
The contractor will be responsible for all necessary facilities, labor, materials, parts, and test/tooling equipment to return items to a Ready For Issue (RFI) condition. Key requirements include:
- Repair and Overhaul: Disassembly, cleaning, inspection, repair/replacement of components, reassembly, and testing according to approved manuals.
- Material Specifications: Prohibits MIL-W-81381 wire, requiring SAE-AS22759 series wire instead. Compliance with IPC/EIAJ-STD-001C if MIL-STD-454 is referenced.
- Quality Assurance: Establish and maintain a quality system compliant with ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3.
- Configuration Management: Adherence to NAVSUP WSS configuration management clause NAVICPIA18.
- Parts and Materials: Contractor to supply all parts and materials, which must be new per FAR 52.211-5, unless Government Furnished Material (GFM) is specified. Cannibalization requires PCO approval.
- Special Conditions: Detailed procedures for handling items determined to be Beyond Economical Repair (BER), Missing on Induction (MOI), or requiring Over and Above Repair (OAR).
Contract & Timeline
- Type: Request for Quote (RFQ) for repair services.
- Pricing: Contractors must submit either a firm-fixed price or Not-To-Exceed (NTE) pricing, along with estimated repair costs.
- Set-Aside: Not Applicable (SBA review).
- Response Due: June 15, 2026, 8:30 PM EDT.
- Published: May 15, 2026.
Additional Notes
The contractor must specify the name and location of the facility performing the work. The Government's acceptance of the contractor's proposal constitutes a bilateral agreement.