17--FAILSAFE ISO AMP CC, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support, is soliciting proposals for the repair and modification of FAILSAFE ISO AMP CC (P/N: 2056AS4110-G01, NSN: 1710-01-551-3461). This solicitation has been amended to reduce the quantity from 8 to 4 units. Government source approval is required prior to award. Quotes are due by April 16, 2026.
Scope of Work
This requirement involves the overhaul, upgrade, repair, testing, and inspection of critical FAILSAFE ISO AMP CC units, which are essential for crucial shipboard aircraft launch/recovery systems. The use of incorrect or defective material could lead to severe consequences. The contractor will be responsible for providing all necessary facilities, labor, materials, parts, and test/tooling equipment to return units to a Ready For Issue (RFI) condition. Repairs must adhere to applicable repair manuals, technical specifications, engineering orders, and drawings.
Contract Details
- Opportunity Type: Solicitation (RFP/RFQ)
- Item: FAILSAFE ISO AMP CC (P/N: 2056AS4110-G01, NSN: 1710-01-551-3461)
- Quantity: 4 units (amended from 8)
- Repair Turnaround Time (RTAT): 117 days after receipt of asset.
- Induction Expiration Date: 365 days after contract award date.
- Quality Requirements: Contractor must maintain a quality system compliant with ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3, ISO-10012-1, or equivalent.
- Configuration Management: Adherence to NAVSUP WSS clause NAVICPIA18.
- Materials: Contractor to supply all parts and materials, which must be new per FAR 52.211-5, unless PCO-approved. Cannibalization is generally not authorized without specific approval.
- Source Approval: Government source approval is required. Unapproved sources must submit detailed information per the NAVSUP WSS Source Approval Brochure with their proposal.
Submission Requirements
- Quotes Due: April 16, 2026, 8:30 PM EDT
- Submission Method: Email to BRIAN.EMDE@NAVY.MIL
- Required Information: If not an approved source, include information detailed in the NAVSUP WSS Source Approval Brochure. Inform the PCO if a Firm Fixed Price (FFP) cannot be determined.
- Early/Incremental Deliveries: Accepted and preferred.
Contact Information
- Primary Contact: BRIAN.J.EMDE.CIV@US.NAVY.MIL
- Phone: 215-697-4313