187th MXG Hanger Floor Resurfacing

SOL #: W50S6N26QA017-187th_MXG_Hanger_Floor_ResurfacingSolicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7MT USPFO ACTIVITY ALANG 187
MONTGOMERY, AL, 36108-4824, United States

Place of Performance

Montgomery, AL

NAICS

Flooring Contractors (238330)

PSC

Maintenance Of Other Airfield Structures (Z1BZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 22, 2026
2
Last Updated
May 20, 2026
3
Submission Deadline
May 29, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, through the 187th Fighter Wing at Dannelly Field, Montgomery, Alabama, is soliciting proposals for non-personal construction services to resurface the hangar floor in Building 1201. This requirement, estimated between $100,000 and $250,000, is a Total Small Business Set-Aside. The Government intends to award a single Firm-Fixed-Price (FFP) contract based on price and past performance. Offers are due May 29, 2026, at 7:00 PM UTC (2:00 PM CDT).

Scope of Work

The contractor shall provide all personnel, equipment, supplies, and supervision to resurface approximately 22,275 square feet of existing resinous-coated concrete flooring in Building 1201. This includes preparing the existing surface (potentially grinding), applying a new flooring system (epoxy coating, aggregate for slip resistance, urethane topcoat tinted medium gray), and reinstalling line striping and safety markings. The existing system includes a moisture vapor barrier and a specific primer (Resuprime 3830 MVT Primer).

Performance Standards

Key performance metrics include a minimum pull-off strength of 350 PSI, a minimum wet static coefficient of friction (SCOF) of 0.60, chemical resistance to aviation fluids (Skydrol, JP-8/JP-4/Jet-A), and a maximum abrasion mass loss of 30 mg. All materials must comply with VOC content restrictions as detailed in Attachment 4.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price (FFP)
  • Estimated Magnitude: $100,000 - $250,000
  • Period of Performance: 60 calendar days from Notice to Proceed. The entire hangar floor will be available for the duration.
  • Response Date: May 29, 2026, 7:00 PM UTC (2:00 PM CDT)
  • Published Date: May 20, 2026
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 238330 (Flooring Contractors) with a $19M size standard.

Site Visit

A site visit was held on May 7, 2026, at 9:00 AM CDT at Building 1502, Wing Headquarters, Dannelly Field. Pre-registration was required due to security requirements, and the period for questions has closed.

Submission & Evaluation

Offers must be submitted electronically to Douglas Seaton (douglas.seaton@us.af.mil) and include:

  • Signed and completed Standard Form (SF) 1442.
  • Completed Section 00 10 00 Contract Line Item Number (CLIN) Schedule with pricing.
  • Completed representations and certifications (or SAM.gov registration confirmation).
  • A minimum of two (2) and a maximum of three (3) recent and relevant past performance references.
  • Acknowledgment of all issued amendments.

Award will be based on price and past performance. Offerors must be registered in SAM.gov and are responsible for monitoring the site for amendments. Two physical verification samples (3'x5') are required prior to full-scale application.

Key Clarifications

Recent Q&A clarified that a moisture vapor barrier was installed, no cove base is required, and using high-visibility tape with coating over it is acceptable for markings.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: May 20, 2026
Version 1
Solicitation
Posted: Apr 22, 2026
View
187th MXG Hanger Floor Resurfacing | GovScope