366 TRS Det 6 Airfield Recovery Tabletop

SOL #: FA302026Q0007Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3020 82 CONS LGC
SHEPPARD AFB, TX, 76311-2743, United States

Place of Performance

DWG, TX

NAICS

All Other Miscellaneous Manufacturing (339999)

PSC

Training Aids (6910)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 19, 2026
2
Last Updated
Mar 25, 2026
3
Submission Deadline
Mar 24, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting quotes for the creation and delivery of four magnetic activity tables with accompanying 3D printed training models for airfield recovery tabletop exercises at Sheppard AFB, TX. This is a Total Small Business Set-Aside. Quotes are due March 27, 2026.

Scope of Work

This Request for Quotation (RFQ) requires the design, fabrication, and delivery of:

  • Four magnetic activity tables (72 in x 30 in): Three depicting unique airfields and one a tent city, as per Attachment 2. Tables must feature realistic terrain, be assembled in sections for easy transport, and have magnetic surfaces for model placement. Runways must extend the full length of the table for marking practice.
  • Accompanying 3D printed training models: As detailed in Attachment 1, these include various aircraft (e.g., C-17, F-15), vehicles (e.g., Humvees, dump trucks), shelters, HESCO barriers, and ancillary equipment. Models must be high-resolution resin printed, professionally airbrush painted for durability and realism, and adhere to a uniform scale between 1:72 and 1:144 (1:72 preferred for larger vehicles). Terrain must have actual texture, not just a printed wrap.
  • CAD design mockups: Required with quotations for customer review prior to fabrication.
  • Protective cases: Pelican cases for 3D printed models and separate cases for activity tabletops.
  • Shipping to Sheppard AFB, TX.

Contract Details

  • Contract Type: Single Firm Fixed Price (FFP) contract.
  • NAICS Code: 339999 (All Other Miscellaneous Manufacturing), with a small business size standard of 550 employees.
  • Set-Aside: Total Small Business.
  • Quote Validity: Quotes must be valid for 90 days.
  • Funding: Funds are not presently available, and award is contingent upon fund availability. The Government reserves the right to cancel the solicitation.

Submission & Evaluation

  • Questions Due: March 25, 2026, at 1:00 PM CST.
  • Quotes Due: March 27, 2026, at 1:00 PM CST.
  • Submission: All quotes and questions must be submitted via email to the primary and alternate contacts.
  • Evaluation: Award will be made to the responsible vendor whose quote represents the best value, considering price and technical capability to meet Government requirements. Offerors must propose lead times.

Key Clarifications from Amendments

  • Airbrushing should be realistic and professional, suitable for daily use, but not require extreme detail.
  • Quantities for items like Hesco blocks refer to the total for the full set of models.
  • No specific government standards for finishes are provided; finishes should be realistic military-standard and durable.
  • No specific fabrication material is required, but materials should support durability.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View
Version 6Viewing
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Mar 17, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Mar 17, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 3, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 19, 2026
View