4520--Project 549A4-26-405 Replace Heat Exchanger Bonham

SOL #: 36C25726R0058Combined Synopsis/Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
257-NETWORK CONTRACT OFFICE 17 (36C257)
San Antonio, TX, 78240, United States

Place of Performance

Bonham, TX

NAICS

Plumbing (238220)

PSC

Space And Water Heating Equipment (4520)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Jan 23, 2026
2
Last Updated
May 13, 2026
3
Submission Deadline
Jun 1, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA) is soliciting proposals for Project 549A4-26-405, Replace Heat Exchanger Bonham, a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. This project involves replacing eight heat exchangers at the Sam Rayburn Memorial Veterans Center in Bonham, Texas. Proposals are due June 1, 2026, at 3:00 PM Central Time.

Scope of Work

This Firm-Fixed-Price contract requires furnishing all materials and labor to replace eight heat exchangers across four buildings (Main Hospital Bldg. 1, Administrative Bldg. 2, Domiciliary Bldg. 24, and Community Living Center Bldg. 29). Key tasks include:

  • Disconnecting, demolishing, and disposing of existing heat exchangers and associated components.
  • Providing and installing new vertical, Steam-to-Water, Semi-Instantaneous, Double-Wall, Cupro-Nickel Tube and Shell heat exchangers with specific GPMs and control valves for each building.
  • Installing new steam piping, condensate piping, relief valves, fittings, gages, and electrical connections.
  • Providing and installing temporary hot water systems for all four buildings during replacement, with specific GPM requirements (38 GPM for Bldgs 1, 2, 29; 75 GPM for Bldg 24).
  • Phasing priority: Bldgs 24 & 29 first, then Bldgs 1 & 2.

Key Requirements & Clarifications

  • Work hours are Monday-Friday, 8:00 a.m. to 4:30 p.m., with minimal after-hours work requiring COR approval.
  • Hot water outages are limited to a maximum of four hours per building, requiring two weeks' advance scheduling and approval. No hot water turn-off for inpatient facilities or kitchen areas.
  • Steam supply pressure for Bldgs 1, 2, 29 is 15-psig; forged steel or stainless fittings are required for 15 psi+ steam systems. VHA Directive 1810(1) on cast iron fittings does not apply if pressure reducing valves are adjusted below 15 PSIG for these buildings.
  • Hazardous material testing has not been completed.
  • Contractor is responsible for Siemens Building Automation System (BAS) integration as a sub-contractor, including feasible monitoring parameters.
  • Approved equals or better are acceptable for replacement heat exchangers. New Pressure Reducing Valve (PRV) assemblies are required.
  • Compliance with Buy American clause and bonding requirements.
  • Texas Sales and Use Tax exemption applies to materials incorporated into VA real estate; proposals should exclude these taxes.
  • A Pre-Construction Risk Assessment (PCRA) permit is required, and an Infection Control Risk Assessment (ICRA) is necessary.

Contract Details

  • Contract Type: Firm-Fixed-Price
  • Estimated Value: $500,000.00 - $1,000,000.00
  • Period of Performance: 180 days after Notice to Proceed (NTP).
  • Place of Performance: Sam Rayburn Memorial Veterans Center, 1201 E. 9th Street, Bonham, TX 75418.
  • NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning Contractors).
  • PSC: 4520 (Space And Water Heating Equipment).

Submission & Evaluation

  • Proposals must be submitted via email to jose.reveles@va.gov.
  • Submissions require four volumes: Technical Acceptability (Vol. I), Past Performance (Vol. II), Price (Vol. III), and Solicitation, Offer, & Award Documents (Vol. IV), with page limitations.
  • Evaluation will prioritize Technical Acceptability (EMR) and Past Performance (more important than price), followed by Price.
  • The liquidated damages clause (FAR 52.211-12) has been removed.
  • Site visits were highly recommended.
  • Questions/RFIs due: May 11, 2026, 10:00 AM CT.
  • Proposal Due: June 1, 2026, 3:00 PM Central Time, Chicago, USA.

Contact Information

People

Points of Contact

Jose RevelesContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 12Viewing
Combined Synopsis/Solicitation
Posted: May 13, 2026
Version 11
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 10
Combined Synopsis/Solicitation
Posted: May 1, 2026
View
Version 9
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Mar 27, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 23, 2026
View
Version 1
Pre-Solicitation
Posted: Jan 23, 2026
View