47--ELBOW,PIPE

SOL #: N0010426QFC76Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP WEAPON SYSTEMS SUPPORT MECH
MECHANICSBURG, PA, 17050-0788, United States

Place of Performance

Place of performance not available

NAICS

Other Metal Valve and Pipe Fitting Manufacturing (332919)

PSC

Hose, Pipe, Tube, Lubrication, And Railing Fittings (4730)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 10, 2026
2
Last Updated
Mar 31, 2026
3
Submission Deadline
Apr 27, 2026, 8:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVSUP Weapon Systems Support Mech, is soliciting proposals for the procurement of Elbow, Pipe (5 inch Flexible Connection Assembly). This is a critical requirement for a shipboard system, designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured), necessitating stringent quality control and traceability. This is a DO rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). Proposals are due by April 27, 2026.

Scope of Work

The requirement is for a 5-inch Flexible Connection Assembly, specifically Elbow, Pipe, in accordance with Oil States Industries Drawing 302576, Assembly 302576-100, with specific amplifications and modifications. The material is for a crucial shipboard system where failure could result in serious personnel injury, loss of life, or loss of vital systems/ship. Extensive documentation, testing, and certification are required for various parts, including quantitative chemical and mechanical analysis, Magnetic Particle Inspection, Liquid Penetrant Inspection, Proof Pressure Tests, and Wedge Tensile Tests. Welding, brazing, and associated procedures must comply with specified military standards.

Contract & Timeline

  • Type: Solicitation
  • Set-Aside: None specified
  • Response Due: April 27, 2026, 8:30 PM UTC
  • Published: March 30, 2026, 9:29 AM UTC
  • Delivery Schedule: Certification Data CDRLs 20 days prior to scheduled delivery; PNSY review 30 working days after receipt; Final material delivery 365 days after contract effective date. Weld procedure/qualification data due 120 days after contract award, with approval 60 days after receipt. Production Radiography (PR) due 135 days after RSS approval, with approval 30 days after receipt.

Key Requirements & Quality Assurance

Contractors must maintain a quality system in accordance with ISO-9001 (or MIL-I-45208) and calibration system requirements of ISO-10012 (or MIL-STD-45662). Government Quality Assurance (GQA) at source is required. Traceability and certification are paramount, with material certifications needing to reflect actual attributes and full compliance. Electronic signatures on Level I certification documents are acceptable under specific controls. All threads must be inspected per FED-STD-H28 series. Mercury-free materials are mandatory. Configuration control, including waivers, deviations, and Engineering Change Proposals (ECPs), is strictly managed. Final inspection includes material sampling (zero defects for lot acceptance) and 100% inspection of material verification data, traceability, and NDT certifications.

Submission Details

The complete RFP package must be signed and returned prior to the closing date. Emailed or faxed proposals are acceptable; NECO quotes will NOT be accepted and will be deemed non-responsive. Contact Ashton K. Perry for inquiries.

People

Points of Contact

ASHTON.K.PERRY.CIV@US.NAVY.MILPRIMARY

Files

Files

View
View

Versions

Version 3
Solicitation
Posted: Mar 31, 2026
View
Version 2Viewing
Solicitation
Posted: Mar 30, 2026
Version 1
Pre-Solicitation
Posted: Mar 10, 2026
View
47--ELBOW,PIPE | GovScope