58--NRP,MODULE,ACOUSTIC, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, has issued a Solicitation for the repair and modification of NRP,MODULE,ACOUSTIC units. This opportunity requires detailed repair services, adherence to specific military standards, and strict quality assurance. Proposals are due by April 27, 2026.
Scope of Work
This requirement covers the repair and overhaul of NRP,MODULE,ACOUSTIC units, ensuring they meet operational and functional requirements as represented by CAGE Code 52088, Ref. No. 77C961405G3. Key aspects include:
- Performing repair work in accordance with contractor's standard practices, manuals, and directives.
- Compliance with ANSI/ESD S20.20 for electrostatic discharge control.
- Physical identification in accordance with MIL-STD-129.
- Strict adherence to mercury-free requirements for materials intended for submarines/surface ships.
- Contractor responsibility for all inspection requirements and maintaining records for 365 days post-delivery.
Contract & Timeline
- Type: Solicitation (anticipated bilateral award)
- Set-Aside: None specified
- Response Due: April 27, 2026, 8:30 PM EDT
- Published: March 26, 2026
- Priority Rating: DO certified for national defense under DPAS.
Key Requirements for Offerors
- If not the Original End Manufacturer (OEM), provide OEM name, CAGE, and a signed letter of authorization as a distributor.
- Provide packaging facility name, address, and CAGE if different from offeror's address.
- Submit an estimated repair price for the full repair effort.
- Vendor shall have 120 days after receipt of carcasses to complete teardown & evaluation (TD&E) and submit a Firm-Fixed Price (FFP) quote.
- Quotes must include the cost of new (actual or estimated) for evaluation, specify any exceptions (e.g., MIL-STD Packaging), and reference the proposed Repair Turn Around Time (RTAT) and capacity constraints. Requested RTAT is 470 days.
- Price reductions will be incurred for not meeting the required RTAT.
Important Notes
This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). Consideration for award will only be given to authorized distributors of the original manufacturer's item; proof of authorization on company letterhead is required with the offer. All contractual documents are considered "issued" by the Government via mail, facsimile, or electronic commerce methods.