58--TIME SYSTEM, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support, is soliciting for repair and modification services for TIME SYSTEM components (NSN 03NF8, P/N ORH-5895-01-592-4603). This opportunity is for Firm Fixed Price Repair Purchase Orders and requires adherence to specific Repair Turnaround Times (RTAT).
Scope of Work
This solicitation covers the repair, testing, inspection, overhaul, and upgrade of TIME SYSTEM components to a Ready For Issue (RFI) condition. Key requirements include:
- Repair Turnaround Time (RTAT): 156 days after receipt of asset.
- Throughput Constraint: Contractors must specify monthly throughput.
- Induction Expiration Date: 365 days after contract award.
- Contractor Responsibility: Provide all necessary facility, labor, materials, parts, test, and tooling equipment. Government-furnished equipment is generally not provided.
- Material Requirements: All parts and materials must be new, in accordance with FAR 52.211-5, unless PCO-approved. MIL-W-81381 wire is prohibited; SAE-AS22759 series wire must be used.
- Quality Requirements: Establish and maintain a quality system conforming to ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or equivalent.
- Configuration Management: Maintain a plan per NAVICPIA18.
- Specific Procedures: Detailed processes for Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) are outlined, requiring DCMA concurrence and PCO approval for disposition or repair.
Contract & Timeline
- Type: Firm Fixed Price Repair Purchase Orders
- Set-Aside: None specified
- Response Due: April 27, 2026, 8:30 PM EDT
- Published: March 27, 2026
Key Requirements
Offerors must specify the repair source/division and location. All contractual documents are considered "issued" upon electronic transmission. Early and incremental deliveries are accepted and preferred.
Contact Information
For inquiries, contact SARAH.L.AUSTIN10.CIV@US.NAVY.MIL or 215-697-2606.