61--CABLE ASSEMBLY,SPEC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, is soliciting offers for the manufacture and supply of CABLE ASSEMBLY,SPEC. This opportunity is designated as a Total Small Business Set-Aside. Offers are due by May 22, 2026.
Scope of Work
This solicitation requires the manufacture and supply of CABLE ASSEMBLY,SPEC that meets specified material and physical requirements, including MIL-STD-130, REV N for marking. Contractors are responsible for all inspection requirements and must maintain records for 365 days post-delivery. Packaging must comply with MIL-STD 2073.
Contract & Timeline
- Type: Solicitation (RFQ for a buy, resultant award will be bilateral)
- Set-Aside: Total Small Business
- Offer Due Date: May 22, 2026, 8:30 PM EDT (extended by amendment)
- Published Date: May 7, 2026 (latest amendment)
Key Requirements & Instructions
- Traceability: If the offeror is not the manufacturer, they must state the manufacturer (NAME & CAGE Code) and provide traceability information within 2 days if requested. Documented evidence of supply chain traceability must be retained for five years.
- Authorized Distributors: Only authorized distributors of the original manufacturer's item will be considered for award. Proof of authorization, on company letterhead and signed by a responsible official, must be submitted with the offer.
- Pricing: Offerors must provide Unit Price (FIRM), Total Price (FIRM), Procurement Turnaround Time (PTAT), Awardee CAGE, and Inspection & Acceptance CAGE. Shipping costs should NOT be included.
- Delivery: Accelerated delivery is encouraged. All freight is FOB Origin.
- Inspection: Government source inspection and acceptance is required.
- Packaging: Required shipping procedure includes military packaging and bar coding.
- Part Changes: Specific procedures are outlined for reporting changes in design, material, servicing, or part number, categorized by codes (e.g., Code 1 for part number change only).
Contact Information
For any questions, contact Sarah Haley at sarah.r.haley2.civ@us.navy.mil or 717-605-3550.