61--REPLACE GENERATORS & COMPONENTS WITHIN EVERGLADES
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), under the Department of the Interior, is soliciting proposals for a Firm Fixed-Price Construction contract to replace generator systems and components within Everglades National Park, Homestead, FL. This is a Total Small Business Set-Aside. Proposals are due by June 5, 2026, at 4:00 p.m. ET.
Scope of Work
The project involves the removal and disposal of three existing standby emergency generator systems and associated components, followed by the purchase and installation of three new diesel-fueled standby emergency generator systems at Park Headquarters (100KW), Daniel Beard Center (75KW), and Pine Island Maintenance Office (30KW). This includes replacing air filtration, fuel systems, cooling, exhaust, and automatic transfer switches. Additionally, four new mobile/portable diesel generators (Tier 4 Final EPA-Certified, 25-38 kW/kVA) must be purchased. Clarifications from the Q&A document specify new conduits, 2-hour fire-rated, ballistic, and impact-resistant fuel tanks (1000-gallon for HQ/Dan Beard, 500-gallon for Pine Island), and specific electrical configurations. Fencing is to be replaced where existing, except at Pine Island. All fixed generators will be tested under building load conditions.
Contract Details
- Type: Firm Fixed-Price Construction
- Set-Aside: Total Small Business (NAICS 238290, Size Standard: $22.0M)
- Estimated Magnitude: Between $500,000 and $1,000,000
- Period of Performance: July 1, 2026, to June 30, 2027 (364 calendar days to complete work after Notice to Proceed)
- Bonds: Performance and Payment Bonds required. A 20% Bid Guarantee (Bid Bond) is also required.
- Wages: Federal Construction Wage Rates for Miami-Dade County, Florida (Davis-Bacon Act) apply, requiring certified payrolls.
Submission & Evaluation
Proposals must be submitted via email to yujeiry_eusebio@ios.doi.gov by the due date. Required submissions include the SF-1442 form, Technical Proposal, Capabilities and Experience, Subcontractor Use and Work History, Past Performance Questionnaires, and a detailed Cost Proposal. Evaluation will consider Technical Approach, Past Performance, Experience, Technical Capability, and Cost Proposals, with award made to the most advantageous, best value offeror.
Key Dates & Information
- Proposal Due: June 5, 2026, 4:00 p.m. ET
- Contact: Yujeiry Eusebio, yujeiry_eusebio@ios.doi.gov, 470-819-0959
- Notes: Offerors must be registered in SAM.gov with an active vendor record and the Total Small Business designation. All amendments and Q&A documents should be reviewed carefully.