66--GENERATOR,PULSE, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support, has issued a Solicitation for the repair and modification of Pulse Generators (NSN 6625014262651, P/N 459659-2). This opportunity requires contractors to restore these critical items to a Ready For Issue (RFI) condition, adhering to stringent quality and configuration management standards. Proposals are due by April 27, 2026.
Scope of Work
This solicitation covers the comprehensive repair, testing, inspection, overhaul, and potential upgrade of Pulse Generators. Key responsibilities include:
- Repair Procedures: Performing work in accordance with the latest approved methods and publications, with strict controls on deviations and waivers.
- Contractor Responsibility: Providing all necessary facilities, labor, materials, parts, and test/tooling equipment. Government Furnished Property (GFP) will not be provided.
- Condition: Returning items to a "Ready For Issue" (RFI) state, defined as performing properly and reliably in an operational environment.
- Specific Processes: Adhering to detailed procedures for "Beyond Economical Repair" (BER), "Missing on Induction" (MOI) of Shop Replaceable Assemblies (SRAs), and "Over and Above Repair" (OAR) items, requiring government concurrence for each.
- Parts and Materials: Supplying new parts and materials per FAR 52.211-5, with strict controls on purchased items and requiring PCO approval for cannibalization or changes to manufacturing sources/facilities.
Contract & Timeline
- Type: Solicitation (under Ordering Agreement N00383-26-G-0017)
- Set-Aside: None specified
- Proposal Due: April 27, 2026, 8:30 PM EDT
- Published: March 31, 2026
Key Requirements
- Quality Management: Contractors must establish and maintain a quality system compliant with ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1.
- Configuration Management (CM): A CM plan is required in accordance with NAVSUP WSS clause NAVICPIA18.
- Process Control: Development and maintenance of repair procedures, test, and inspection information for government review and approval.
- Source of Repair: The contractor must specify the name and location of the facility performing the work.
Contact Information
For inquiries, contact VALERIE.M.WERNER2.CIV@US.NAVY.MIL or call 215-697-2198.