AI HPC Server

SOL #: FA910126QB024Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA9101 AEDC PKP PROCRMNT BR
ARNOLD AFB, TN, 37389-1332, United States

Place of Performance

Holloman Air Force Base, NM

NAICS

Electronic Computer Manufacturing (334111)

PSC

Hardware, Software, And Other Equipment Needed For Specialized High Performance Computing (Hpc) Systems Used In Solving Complex Computational Problems Through Massive Concurrent Use Of Computing Resources And Parallel Processing Techniques. (7B20)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 23, 2026
2
Last Updated
Apr 3, 2026
3
Submission Deadline
Apr 3, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for an AI HPC Server to support the 704th Test Group's mission-critical Artificial Intelligence (AI) training, deep learning, and High-Performance Computing (HPC) workloads at Holloman Air Force Base, NM. This is a Total Small Business Set-Aside. Proposals are due April 3, 2026, at 3:00 PM ET.

Scope of Work

The requirement is for one (1) GPU-accelerated rackmount server system, specifically a fully configured Supermicro GPU SuperServer SYS-522GA-NRT or a fully equivalent system. The system must be designed for AI/Deep Learning, 3D Rendering, and High-Performance Computing.

Key Technical Specifications

  • System Platform: Supermicro SYS-522GA-NRT 5U rackmount GPU server (or equivalent).
  • Processors: Minimum 2 enterprise-class server processors meeting or exceeding Intel® Xeon® 6952P specifications (minimum 192 physical cores total, DDR5-6400 ECC RDIMM support).
  • Memory: 512 GB DDR5 ECC RDIMM (16 x 32 GB modules).
  • Storage: 1 x 480 GB M.2 NVMe SED solid-state drive for OS/boot volume.
  • GPU/Accelerator: 4 x Data-center or enterprise-class GPUs equivalent to or better than NVIDIA RTX PRO 6000 Blackwell Server Edition (minimum 96 GB VRAM per GPU), designed for continuous server operation and virtualization.
  • Networking: 2 x 10 GbE RJ-45 Ethernet ports.
  • Warranty: 3 years parts and labor, 1 year cross-shipment replacement, drive retention, technical telephone support.
  • Delivery: No later than 60 days after receipt of order (ARO).

Contract & Timeline

  • Type: Combined Synopsis/Solicitation (Firm Fixed Price)
  • Solicitation Number: FA910126QB024
  • Set-Aside: Total Small Business (100%)
  • NAICS: 334111 (1250 employees size standard)
  • Product Service Code (PSC): 7B20
  • Offer Due Date: April 3, 2026, 3:00 PM ET
  • Published Date: April 3, 2026
  • Agency: Department of the Air Force, FA9101 AEDC PKP PROCRMNT BR

Submission & Evaluation

Offerors must complete blocks 12, 17, 23, 24, and 30 of the solicitation. Submission instructions and evaluation criteria, including various FAR and DFARS clauses, are detailed within the solicitation document. Payment requests and receiving reports are to be submitted electronically via Wide Area WorkFlow (WAWF).

Place of Performance & Delivery

The server will be delivered to 1644 Vandergrift Road, Building 1265, Holloman Air Force Base, New Mexico 88330.

Contact Information

For inquiries, contact Brett Moore at brett.moore.6@us.af.mil.

People

Points of Contact

Brett MoorePRIMARY

Files

Files

Download
Download

Versions

Version 5Viewing
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 23, 2026
View