AK ARCTIC NWR BIG RAM LAKE Soil & Hazardous Materi

SOL #: 140FS126Q0104Solicitation

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, SAT TEAM 1
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Remediation Services (562910)

PSC

Hazardous Substance Removal, Cleanup, And Disposal Services And Operational Support (F108)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 22, 2026
2
Submission Deadline
Jun 8, 2026, 4:59 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The US Fish and Wildlife Service, under the Department of the Interior, is soliciting proposals for Soil & Hazardous Material Evaluation services at the Arctic National Wildlife Refuge (NWR) Big Ram Lake site in Alaska. This Total Small Business Set-Aside opportunity requires environmental services to characterize potential AVGAS spills and evaluate buildings for asbestos, lead, and PCB paint. The contract is a Firm-Fixed Price type, with work to be completed by December 31, 2026. Quotes are due June 7, 2026, at 11:59 PM Central Time.

Scope of Work

This solicitation covers comprehensive environmental services at a remote site accessible only by float plane. Key requirements include:

  • AVGAS Spill Characterization: Delineate and characterize potential AVGAS spills, including soil and groundwater analysis for specific analytes (GRO, BTEX, PAHs, EDB, VOCs, Total Lead). Develop a site characterization and Remediation Plan and Report. If remediation is needed, a cost proposal for a Corrective Action Plan will be required.
  • Building Hazardous Materials Evaluation: Conduct asbestos, lead, and PCB paint evaluations for buildings scheduled for demolition. This includes identifying material types, condition, location, and estimating remediation costs.
  • Reporting: Provide detailed reports, including Site Characterization Reports, Corrective Action Completion Reports, and separate reports for hazardous materials identified in buildings.
  • Compliance: All work must comply with Alaska Department of Environmental Conservation (ADEC) regulations and guidance.

Contract & Timeline

  • Contract Type: Firm-Fixed Price
  • Period of Performance: Generally from June 22, 2026, with all work to be completed by December 31, 2026.
  • Place of Performance: Big Ram Lake, Arctic National Wildlife Refuge, Alaska (remote site).
  • Set-Aside: 100% for Small Business (FAR 19.5).
  • Product Service Code (PSC): F108 (Hazardous Substance Removal, Cleanup, And Disposal Services And Operational Support).
  • NAICS Code: 562910 (Remediation Services).
  • RFI Deadline: May 31, 2026, 11:59 PM Central Time.
  • Quotes Due: June 7, 2026, 11:59 PM Central Time.

Submission & Evaluation

  • Submission Method: All quotes must be submitted via email to Tanner_Frank@ios.doi.gov. Telephone calls will not be accepted.
  • Required Documents: Completed SF-1449, completed Bid Schedule, and a Technical Submission. These must be submitted as three individual PDF files.
  • Email Subject Line: Must include the Solicitation Number (140FS126Q0104).
  • Evaluation Criteria: Best Value Trade-Off, with price as the primary factor. Evaluation will consider Required Qualifications, Technical Approach, Past Performance, and Technical Acceptability (Pass/Fail). Technical acceptability requires ADEC qualification, relevant experience, ability to perform tasks, completion by December 31, 2026, and ability to work in remote Alaskan areas.

Eligibility & Notes

  • SAM Registration: Offerors must have an Active SAM Registration with no exclusions at the time of quote submission and award.
  • UEI: Offeror's Unique Entity ID (UEI) must be included in the Bid Schedule.
  • Contractor Responsibility: The contractor is responsible for transporting all necessary supplies and equipment to the remote site, obtaining all permits, ADEC coordination, work plans, and contingencies.
  • Qualifications: Personnel must meet specific environmental professional qualifications, including certifications for asbestos and lead inspections.

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: May 22, 2026
AK ARCTIC NWR BIG RAM LAKE Soil & Hazardous Materi | GovScope