ALF Heavy and Normal Maintenance on the Rocky Gap ATV Trail system

SOL #: 12444326P0014Award Notice

Overview

Buyer

Agriculture
Forest Service
ALLEGHENY NATIONAL FOREST
WARREN, PA, 16365, United States

Place of Performance

Warren, PA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Recreation Facilities (Non Building) (Z2PA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 22, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The FOREST SERVICE, Allegheny National Forest, has issued an Award Notice for Heavy and Normal Maintenance on the Rocky Gap ATV Trail system located in Warren, PA. This opportunity was designated as a Total Small Business Set-Aside.

Scope of Work

The awarded contract covers heavy and normal maintenance services required for the Rocky Gap ATV Trail system. This includes activities necessary to ensure the trail's usability and safety.

Contract & Timeline

  • Type: Award Notice (specific contract vehicle not detailed)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Award Date: April 22, 2026

Additional Notes

For further information regarding this award, please contact Michael Simpson at michael.simpson@usda.gov.

People

Points of Contact

Michael SimpsonPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Award Notice
Posted: Apr 22, 2026
ALF Heavy and Normal Maintenance on the Rocky Gap ATV Trail system | GovScope