ALF Heavy and Normal Maintenance on the Rocky Gap ATV Trail system
SOL #: 12444326P0014Award Notice
Overview
Buyer
Agriculture
Forest Service
ALLEGHENY NATIONAL FOREST
WARREN, PA, 16365, United States
Place of Performance
Warren, PA
NAICS
Other Heavy and Civil Engineering Construction (237990)
PSC
Repair Or Alteration Of Recreation Facilities (Non Building) (Z2PA)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Apr 22, 2026
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The FOREST SERVICE, Allegheny National Forest, has issued an Award Notice for Heavy and Normal Maintenance on the Rocky Gap ATV Trail system located in Warren, PA. This opportunity was designated as a Total Small Business Set-Aside.
Scope of Work
The awarded contract covers heavy and normal maintenance services required for the Rocky Gap ATV Trail system. This includes activities necessary to ensure the trail's usability and safety.
Contract & Timeline
- Type: Award Notice (specific contract vehicle not detailed)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Award Date: April 22, 2026
Additional Notes
For further information regarding this award, please contact Michael Simpson at michael.simpson@usda.gov.
People
Points of Contact
Michael SimpsonPRIMARY
Files
Files
No files attached to this opportunity
Versions
Version 1Viewing
Award Notice
Posted: Apr 22, 2026