Amendment 01 Textile Warehouse Office Addition and Renovation

SOL #: W91QF426BA001Amendment01Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT LEAVENWORTH
FORT LEAVENWORTH, KS, 66027-0000, United States

Place of Performance

Fort Leavenworth, KS

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 18, 2026
2
Last Updated
Mar 19, 2026
3
Submission Deadline
Apr 14, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

This Solicitation Amendment 01 from the Department of the Army is for the Textile Warehouse Office Addition and Renovation at Fort Leavenworth, Kansas. This Total Small Business Set-Aside opportunity seeks a general contractor for Sustainment, Restoration, and Modernization (SRM) of the USDB Textiles Warehouse (Building B1146). The project magnitude is estimated between $1,000,000 and $5,000,000. Proposals are due by April 14, 2026.

Scope of Work

The project involves the addition of an approximate 1,280 SF metal building office and a new recessed truck dock. The scope also includes comprehensive repairs and renovations such as:

  • Repair or replacement of mechanical, electrical, and fire protection/detection systems.
  • Interior remodeling, including carpentry, painting, floor, and wall coverings.
  • Modification of the existing fire sprinkler system to meet UFC-3-600-01 and NFPA 13, including in-rack sprinkler heads and potential pump replacement.
  • Addition/relocation of fire alarm detectors and reprogramming per UFC-3-600-01 and NFPA 72.
  • Demolition and installation of gas supply, new communications conduit, and sewer service line.
  • Demolition and installation of new NEC electrical equipment and data drops. The contractor will be responsible for providing stamped structural engineered drawings for the addition and foundations, and has the option to construct the roof and walls using traditional metal building methods or metal studs with exterior siding.

Contract & Timeline

  • Contract Type: Solicitation (Agreement for sole award for specific SRM tasks)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Z2JZ - Repair Or Alteration Of Miscellaneous Buildings
  • Magnitude: $1,000,000 - $5,000,000
  • Response Due: April 14, 2026, 7:00 PM UTC
  • Questions Cut-off: March 31, 2026
  • Published Date: March 19, 2026

Key Requirements & Clarifications

The successful contractor must be an experienced general contractor capable of managing numerous task orders, including construction scheduling, cost estimating, quality control, and subcontractor coordination. Key requirements and clarifications include:

  • Compliance: Adherence to updated building codes (UFC, IBC, NFPA, etc.), energy conservation codes (IECC), and the Architectural Barriers Act (ABA).
  • Site Logistics: Tenant will move out during construction; 72-hour notice required for utility shutdowns.
  • Waste Management: Divert at least 60% of demolition/construction waste from landfills.
  • Asbestos Abatement: Detailed specifications for abatement, requiring compliance with OSHA, EPA, and other regulations.
  • Bonding & Insurance: Individual task orders require bonding per FAR 28.102, and specific liability insurance must be maintained.
  • Personnel: Assignment of a Project Manager and mandatory ID badges for contractor employees.
  • Wage Determinations: Applicable wage determinations (e.g., KS20260053) will dictate pay rates.
  • Submittals: Extensive documentation required, including pre-construction, shop drawings, O&M manuals, As-Built drawings, and a Site-Specific Safety Plan.
  • Telecommunications: Specific hardware and configuration for an 18U telecommunications cabinet, including grounding and fire-rated materials.
  • Contractual: Vendors must be registered as an SBA and on SAM.gov. Buy-American Act and liquidated damages apply. Substitutions are acceptable if of equal or greater quality.

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download