Anniston Army Depot FORGE II Other Transaction Authority (OTA) Request for Project Proposal (RPP) - W91QEY-26-R-A002

SOL #: 616b9b92b6544e018b710924a4fd5647Special Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC TSC
FORT SAM HOUSTON, TX, 78234-0000, United States

Place of Performance

Anniston, AL

NAICS

Commercial and Institutional Building Construction (236220)

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
May 27, 2026
2
Action Date
Jun 29, 2026, 12:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army's Mission & Installation Contracting Command (MICC) Theater Support Center (TSC) has issued a Request for Project Proposals (RPP) W91QEY-26-R-A002 under Other Transaction Authority (OTA) for the Anniston Army Depot (ANAD) Facilities, Operations, Readiness, Growth and Experience (FORGE) II project. This RPP seeks proposals for the design and construction of four new Military Construction (MILCON) facilities at ANAD, Alabama. The objective is to modernize ANAD facilities to enhance readiness, morale, and mission effectiveness. Proposals are due June 27, 2026, at 5:00 PM EDT.

Scope of Work

The project involves the design and construction of four primary MILCON facilities:

  • Component Remanufacture Facility (requiring update of existing 35% design drawings)
  • Missile Maintenance Facility
  • Paint Facility
  • Storage Facility (two warehouses) Designs must be code-compliant, incorporate industrial process layout, meet Anti-Terrorism/Force Protection (AT/FP) and Risk Management Framework (RMF) controls, and be executed in a 3D Building Information Modeling (BIM) environment. Construction requires specific experienced personnel and adherence to ANAD access, security, and environmental protocols. Deliverables include 65%, 95%, and 100% design submittals, various plans (Contractor Quality Control Plan, Site Safety and Health Plan), environmental documents, schedules, reports, and full closeout documentation.

Contract & Timeline

  • Contract Type: Other Transaction Authority (OTA), with a Firm-Fixed-Price (FFP) agreement contemplated. This acquisition is outside the Federal Acquisition Regulation (FAR).
  • Period of Performance: Not to exceed 60 months.
  • Estimated Funding: Approximately $660 million for design and construction. Optional Agreement Line Item Numbers (ALINs) may be exercised for equipment (estimated $230 million) and Restore and Modernize (R&M) projects (estimated $85 million). The total estimated value for the project, including options, is approximately $986 million.
  • Award Type: A single award is intended, but multiple awards are possible if no single offeror can accomplish the entire scope.
  • Set-Aside: No specific set-aside is mentioned.
  • Published Date: May 27, 2026
  • Industry Questions Due: June 5, 2026, at 12:00 PM EDT (submit via email using QA_ANAD_FORGE II worksheet).
  • Site Visit: June 10, 2026 (registration required by June 4, 2026, 12:00 PM EDT using ANAD FORGE 2.0 Site Visit Registration worksheet).
  • Proposal Due Date: June 27, 2026, at 5:00 PM EDT.

Submission & Evaluation

Proposals must be submitted via email to usarmy.jbsa.acc-micc.mbx.tsc-div1@army.mil.

  • Technical Volume: Limited to 60 pages (PDF), including Management Plan, Milestone Schedule, and Added Value.
  • Price Volume: Separate Excel file, with price narratives limited to 10 pages.
  • Evaluation Factors: Management Plan, Milestone Schedule, Added Value, and Price.
  • Requirements: Offerors must provide a Bond Letter validating surety bonding capability and plan for Cybersecurity Maturity Model Certification (CMMC) Level 2 self-certification by September 30, 2026. Full vetting of all employees through the Installation Visitor Control Center (VCC) is required.

Points of Contact

People

Points of Contact

MICC TSC Division 1 PLEASE EMAIL HERE FIRSTPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Special Notice
Posted: May 27, 2026