Anniston Army Depot FORGE II Other Transaction Authority (OTA) Request for Project Proposal (RPP) - W91QEY-26-R-A002
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, through the Mission & Installation Contracting Command (MICC) Theater Support Center (TSC), has issued a formal Request for Project Proposals (RPP) for the Anniston Army Depot (ANAD) Facilities, Operations, Readiness, Growth and Experience (FORGE) II initiative. This opportunity, under Other Transaction Authority (OTA) (10 U.S.C. 2808a), seeks proposals for the design and construction of four major facilities at Anniston, AL, along with optional Restore and Modernize (R&M) projects and equipment purchases. The estimated total value is approximately $986.9 million. Project proposals are due June 29, 2026, at 07:00 AM CDT.
Scope of Work
This RPP covers the design and construction of:
- A Component Remanufacture Facility
- A Missile Maintenance Facility
- A Paint Facility
- A Storage Facility (two warehouses)
Optional Restore and Modernize (R&M) projects (estimated $87.7M) and equipment purchases (estimated $241M) are also included. The total estimated funding is approximately $658 million for MILCON construction, $87.7 million for R&M, and $241 million for equipment. The contractor will be responsible for all permits, with government assistance as needed. Key personnel requirements include Design-Build Project Manager, Project Superintendent, Construction Quality Control (QC) Manager, Site Safety & Health Officer (SSHO), and Design QC Manager.
Contract & Timeline
- Contract Type: Other Transaction Authority (OTA) – not FAR-based. Firm-Fixed-Price (FFP) is contemplated.
- Period of Performance: Not to exceed 60 months.
- Set-Aside: None specified.
- Questions Due: June 15, 2026, at 06:00 AM EDT.
- Project Proposals Due: June 29, 2026, at 07:00 AM CDT.
- Site Visit: A site visit was held on June 10, 2026 (registration closed June 4, 2026).
Submission & Evaluation
Proposals will be evaluated based on an integrated assessment of the Management Plan, Milestone Schedule, Added Value, and Price. Past Performance is not being evaluated as an OTA criterion. Offerors should follow RPP instructions for proposal submission. The Project Labor Agreement (PLA) language has been officially removed from the RPP. Successful awardees must be self-certified CMMC Level 2 by September 30, 2026, and comply with Davis Bacon Act, Buy American Act, and Miller Act.
Additional Notes
CAD files (RPP attachments 0001.8, 0002.1, and 0003.1) are available upon request. Many documents are controlled access, requiring prospective prime contractors to verify their ability to receive and secure official use only or controlled unclassified information. The government will release all possessed geotechnical information, but offerors may need to conduct their own investigations. Resilient design and energy conservation measures will be viewed favorably, though LEED certification is not required.