Baptist Camp Bridge Maintenance

SOL #: 127EAX26Q0009Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
Tonto National Forest
PHOENIX, AZ, 85006, United States

Place of Performance

AZ

NAICS

Highway (237310)

PSC

Maintenance Of Highways/Roads/Streets/Bridges/Railways (Z1LB)

Set Aside

Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15) (WOSB)

Timeline

1
Posted
Mar 13, 2026
2
Last Updated
Mar 20, 2026
3
Submission Deadline
Apr 7, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Forest Service, Tonto National Forest, is soliciting quotations for Baptist Camp Bridge Maintenance in the Payson Ranger District, Arizona. This Women-Owned Small Business (WOSB) Program Set-Aside opportunity requires repairs to the bridge's wearing surface, drainage, timber posts, asphalt approaches, and object markers. Quotations are due April 7, 2026, by 12:00 PM Mountain Time.

Scope of Work

The project involves comprehensive maintenance and repair of the Baptist Camp Bridge, a one-lane bridge spanning Tonto Creek. Key tasks include:

  • Mobilization and temporary traffic control.
  • Repairing and installing a new timber wearing surface, including cleaning the deck, applying wood preservative, and ensuring proper attachment of rough-sawn lumber planks.
  • Improving drainage on the upstream side.
  • Replacing missing or damaged timber posts and blocks on the guardrail.
  • Repairing and resurfacing asphalt approaches with base aggregate and asphalt concrete pavement.
  • Replacing object markers according to MUTCD specifications. All work must adhere to US DOT FHWA "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14" and Forest Service Supplemental Specifications.

Contract Details

  • Type: Request for Quotation (RFQ), Combined Synopsis/Solicitation, Firm-Fixed-Price.
  • Set-Aside: SBA Certified Women-Owned Small Business (WOSB).
  • NAICS: 237310 (Highway, Street, and Bridge Construction) with a $45M size standard.
  • Period of Performance: 60 days from Notice to Proceed (NTP).
  • Place of Performance: Tonto National Forest, Payson Ranger District, Gila County, Arizona.

Submission & Evaluation

  • Quote Due Date: April 7, 2026, 12:00 PM Mountain Time.
  • Submission Method: Email quotations to toinette.aranda@usda.gov.
  • Required Documents: Transmittal Summary Letter, completed SF 1442, and a fillable Schedule of Items (Excel). Technical Proposal limited to 5 pages.
  • Evaluation Criteria: Best Value, considering Technical Approach, Past Performance, and Price. Award will not necessarily be made to the lowest-priced offeror.
  • Key Deliverables (initial): Temporary Traffic Control Plan, Project Schedule, Hazardous Spill Prevention Plan, Erosion and Sediment Control Plan (within 5 business days of award), and Manufacturer Specifications (within 10 business days of award).

Important Dates & Notes

  • Site Visit: March 23, 2026, 11:00 AM local time. Confirm attendance by March 20, 2026, via email to Nicholas Estrada-Stephen.
  • Questions/RFIs Due: March 30, 2026, 1:00 PM Mountain Time.
  • Mandatory Compliance: Adherence to the Tonto Fire Plan, prevailing wage rates (Wage Decision AZ20260051), and specific construction specifications (FP-14, FS Supplemental Specs) is required. Bidders must provide their own water and dispose of debris off Forest Service land.
  • Attachments: Maps (Attach 02), Fire Plan (Attach 04), Wage Decision (Attach 05), Schedule of Items (Attach 08), FP-14 Specs (Attach 06), FS Supplemental Specs (Attach 03), and a visual reference (Attach 07) are available.

People

Points of Contact

Toinette ArandaPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Mar 20, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 16, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 13, 2026
View
Baptist Camp Bridge Maintenance | GovScope