Bathroom Renovations for USCG STATION SANTA BARBARA RESIDENCIES

SOL #: 31100PR260000015Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE LOS ANGELES/LONG BEACH(00037)
SAN PEDRO, CA, 90731, United States

Place of Performance

Santa Barbara, CA

NAICS

Residential Remodelers (236118)

PSC

Maintenance Of Family Housing Facilities (Z1FA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 16, 2025
2
Last Updated
May 4, 2026
3
Submission Deadline
Jan 13, 2025, 4:59 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The US Coast Guard, Base Los Angeles/Long Beach, under the Department of Homeland Security, is seeking bids for Bathroom Renovations at USCG STATION SANTA BARBARA RESIDENCIES in Santa Barbara, CA. This opportunity, reopened due to an extended government shutdown, focuses on the corrective removal and replacement of six (6) failing bathtub and shower pan assemblies and the standardization of all replacement units. This is a Total Small Business Set-Aside. Proposals are due by May 12, 2026.

Scope of Work

The primary objective is to address progressive cracking in existing bathtubs and shower bases within Santa Barbara Coast Guard housing units by replacing six (6) failing tub and shower pan assemblies. The project requires standardization of all replacement tub/pan models, surround materials, waterproofing systems, hardware, and installation methodologies across all six units. Key tasks include:

  • Demolition of existing fixtures, surrounds, tile, backer board, and compromised materials.
  • Inspection and repair of subflooring, structural elements, wall assemblies, and plumbing as needed.
  • Installation of new, standardized tub/shower units in accordance with manufacturer specifications and building codes.
  • Finishes and restoration to match existing conditions, ensuring units are ready for immediate use.
  • The contractor must provide all labor, materials, equipment, supervision, and incidentals. Work must comply with current building codes, manufacturer installation requirements, and industry best practices. Detailed specifications for various bathroom components are provided in attached documents, which bidders must reference for proposal development.

Contract & Timeline

  • Opportunity Type: Combined Synopsis/Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Z1FA (Maintenance Of Family Housing Facilities)
  • Response Due: May 12, 2026, 03:59 PM UTC
  • Published Date: May 4, 2026, 04:35 PM UTC
  • Place of Performance: USCG Santa Barbara Housing, 1801, 1805, 1806, 1808, 1809, 1817 Lighthouse Place, Santa Barbara, CA 93109.
  • Work Hours: 7:30 AM - 3:30 PM, Monday through Friday (Federal Holidays excluded), unless otherwise approved.

Evaluation Factors

Award will be made to the responsible offeror whose proposal is most advantageous to the Government, considering:

  • Technical capability
  • Past performance
  • Price Technical capability and past performance, when combined, are more important than price alone. Documentation showing past performance and certifications are required.

Special Requirements & Deliverables

  • A site visit is required prior to work. Specific site visit questions should be directed to Rachel Hanson or Mr. Ruijin Garcia.
  • Submission of a standardized materials package for approval.
  • Work schedule coordination with the Facilities Engineer.
  • Implementation of protective measures for occupied units.
  • Contractor personnel require security clearance; a list of all on-site personnel must be provided 5 days prior to work commencement, along with photo identification and proof of US citizenship or legal right to work.
  • 24-hour advance notice required for all deliveries; vehicle registration and proof of liability insurance needed for access.
  • Lock Out/Tag Out Procedures coordination required.
  • Written notification required 5 business days before starting work and 3 business days before final inspection.
  • Contractor is responsible for refuse and waste material disposal in accordance with federal, state, and local laws.
  • Adherence to OSHA, California Code of Regulations, and EM385-1-1 safety standards; an Accident Prevention/Safety Plan must be submitted.
  • Products must meet Buy American and Buy America Acts requirements.
  • Deliverables include: Standardized materials submittal, Work Schedule, Daily Progress Logs, Final Inspection and testing records, Warranty Documentation.
  • Bids must include a breakdown of costs for labor and materials.

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Jan 23, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Jan 6, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Dec 30, 2025
Version 3
Combined Synopsis/Solicitation
Posted: Dec 29, 2025
View
Version 2
Combined Synopsis/Solicitation
Posted: Dec 29, 2025
View
Version 1
Combined Synopsis/Solicitation
Posted: Dec 16, 2025
View
Bathroom Renovations for USCG STATION SANTA BARBARA RESIDENCIES | GovScope