Bldg 128 Freezer Door Replacement

SOL #: N4008526R9019Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 3, 2026
2
Last Updated
Mar 26, 2026
3
Submission Deadline
Apr 2, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for the Bldg 128 Freezer Door Replacement project at Camp Lejeune, NC. This opportunity is restricted to a specific list of M&R MACC contractors. The project involves the removal of an existing freezer door and the installation of a new, insulated freezer door system to ensure an airtight seal. The estimated cost range is $25,000 to $100,000, with a contract completion time of 180 days after award. Proposals are due April 2, 2026, at 2:00 PM EST.

Scope of Work

The project's objective is to replace one freezer door at Building 128, Camp Lejeune, N.C. Key tasks include:

  • Removal of the existing freezer door, jambs, headers, and threshold.
  • Repair of walls, floor, and ceiling affected by demolition.
  • Installation of a new 72" x 61-1/2" panel, 4-inch thick, insulated freezer door with specific hardware (e.g., polished stainless steel, cylinder lock, safety-release handle).
  • Ensuring an airtight seal and providing a new stainless steel threshold.
  • Installation of anti-condensing strip heaters, specific gaskets, and strip curtains.
  • Compliance with standards such as ASTM E84, NSF ANSI 2 & 7, and UL 207 & 723.
  • Contractor responsibilities include field measurements, arranging access, and proper disposal of materials (including asbestos/lead-painted products at the Camp Lejeune landfill).

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (Lowest Price Award)
  • Estimated Cost Range: $25,000 - $100,000
  • Completion Time: 180 days after award
  • Liquidated Damages: $220 per Calendar Day
  • Set-Aside: Restricted to specific M&R MACC contractors: T.E. Davis Construction Company, Joyce & Associates Construction, Inc., Olympic Enterprises, Inc., and Quadrant Construction.
  • Product Service Code: Z2JZ (Repair Or Alteration Of Miscellaneous Buildings)
  • Place of Performance: Building 128, Camp Lejeune, NC 28547

Submission & Evaluation

  • Proposal Due Date: April 2, 2026, 2:00 PM EST.
  • Submission Method: Email proposals to NAVFAC_ML_ROICCCampLejeune-Bids1@navy.mil AND benjamin.a.bryan.civ@us.navy.mil.
  • Basis for Award: Lowest Price, considering Buy American statute requirements.
  • Bond Requirements: Payment bond required for proposals $40K and greater; bid, payment, and performance bonds for proposals $150K and greater. No bonds for proposals less than $40K.
  • Eligibility: Only listed M&R MACC contractors may submit.

Key Dates & Contacts

Additional Requirements

Bidders must adhere to the Contractor Environmental Guide for MCB Camp Lejeune, comply with Executive Order 13706 (Paid Sick Leave), and the Buy American Requirement-Construction Materials. Required submittals include shop drawings, product data, a 10-year warranty, and as-built drawings. Fabricator and installer must have a minimum of three years documented experience, and the installer must be certified by the door manufacturer.

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 2
Combined Synopsis/Solicitation
Posted: Mar 26, 2026
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 3, 2026
Bldg 128 Freezer Door Replacement | GovScope