Bldg G560 Domestic Water Line Repairs
SOL #: N4008526R9022Combined Synopsis/Solicitation
Overview
Buyer
Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States
Place of Performance
Camp Lejeune, NC
NAICS
Plumbing (238220)
PSC
Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Mar 16, 2026
2
Last Updated
Mar 18, 2026
3
Submission Deadline
Apr 15, 2026, 7:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Domestic Water Line Repairs at Building G560, Marine Corps Base Camp Lejeune, NC. This project, identified as Project 24-0030, involves comprehensive repairs to the building's domestic water system. The estimated cost range is $250,000 to $500,000. Proposals are due April 16, 2026, at 3:00 PM EST.
Scope of Work
The project entails the repair and alteration of the domestic water line for Building G560. Key aspects include:
- Removal or alteration of existing work, ensuring repaired portions match existing structures.
- Professional location of underground utilities, including pot-holing for confirmation. Notification to the Contracting Officer's Representative (COR) is required 48 hours prior to starting excavation work.
- Coordination with the Marine Corps Enterprise Network (MCEN) for BaseTel Access towards the end of construction.
- Awareness and handling of identified asbestos-containing materials (ACM) within Building G560, as detailed in the Asbestos Inspection Report dated August 18, 2025.
- Adherence to detailed construction drawings for plumbing, electrical, and demolition work, including specific components like backflow preventers and water heaters.
- The contract completion date is 270 days after award, with liquidated damages of $220 per Calendar Day for delays.
Contract Details
- Contract Type: Combined Synopsis/Solicitation (likely Fixed-Price, based on "Lowest Price" award basis).
- Estimated Value: $250,000 - $500,000.
- Period of Performance: 270 days after award.
- Set-Aside/Eligibility: While the overarching contract vehicle may be a Total Small Business Set-Aside, this specific opportunity is restricted to Mechanical MACC Contractors listed on the General Requirements cover page. Specifically, only Mechworks Mechanical Contractors, Inc.; North State Mechanical, Inc.; and R&W Construction Company, Inc. are eligible to submit proposals for this project.
- Place of Performance: Building G560, Marine Corps Base Camp Lejeune, NC 28547.
- Product Service Code: Z2JZ - Repair Or Alteration Of Miscellaneous Buildings.
Submission & Evaluation
- Proposal Due Date: April 16, 2026, 3:00 PM EST.
- Requests for Information (RFIs) Cut-off: April 2, 2026, 3:00 PM EST.
- Submission Method: Proposals must be submitted via email to emily.a.walton6.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil.
- Basis for Award: Lowest Price.
- Proposal Acceptance Period: 60 days from receipt of offers.
- Site Visit: A site visit was scheduled for Thursday, March 26 at 9 AM at Building G560 on Camp Geiger.
- Important Note: Offerors are advised that funding may not become available, and no award will be made if funds are not available. No reimbursement for effort or proposal costs. Applicable clauses include Buy American Requirement-Construction Materials, Paid Sick Leave (EO 13706), and minimum wage requirements (EO 13658).
Contact Information
- Primary Contact: Emily Walton, emily.a.walton6.civ@us.navy.mil, 757-994-5759.
People
Points of Contact
Emily WaltonPRIMARY
Files
Versions
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Mar 18, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 16, 2026