C--BLM Tomahawk Detention Dam Rehabilitation NID # MT

SOL #: 140L0626Q0009Combined Synopsis/Solicitation

Overview

Buyer

Interior
Bureau Of Land Management
NATIONAL OPERATIONS CENTER
DENVER, CO, 80225, United States

Place of Performance

Place of performance not available

NAICS

Engineering Services (541330)

PSC

Architect And Engineering Construction: Dams (C1KA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 5, 2026
2
Last Updated
May 13, 2026
3
Submission Deadline
May 26, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Land Management (BLM) is seeking a qualified firm to provide Architect/Engineering (A/E) professional services for the Tomahawk Detention Dam Rehabilitation Project near Glasgow, Montana. This Total Small Business Set-Aside opportunity requires Title I and Title II design services to replace the dam's existing outlet works. SF330 Qualification Statements are due May 26, 2026, by 12:00 PM MT.

Scope of Work

The selected firm will develop a complete design for the replacement outlet works system, including the inlet structure, reinforced concrete conduit, engineered backfill, filter diaphragm, foundation preparation, outlet berm improvements, and a grouted stilling basin. Designs must comply with FEMA P-93, FEMA P-94, BLM Manual 9177, the National Dam Safety Program Act, and Departmental Manual 753 DM 1 and 753 DM 2. Supporting tasks include geotechnical investigations, site surveys, hydraulic evaluations, construction cost estimates, and design reviews. The dam is an earthen embankment, 22.5 feet high, with an existing 110-foot corrugated metal pipe outlet. This is a brand-new requirement, with construction anticipated to start in summer 2028, subject to funding.

Contract Details

This is a Total Small Business Set-Aside requirement under NAICS Code 541330 (Engineering Services). The estimated construction cost for the project is $1,100,000. The government may consider the most highly qualified firm for Title III (construction-phase) services, which would be procured through a separate contract.

Submission & Evaluation

Offerors must submit an electronic SF 330 (Parts I and II) in PDF format, not exceeding 25 MB and 50 pages, to the Points of Contact. Questions were due May 12, 2026. The selection process will be based on demonstrated competence and qualifications. Evaluation criteria, in descending order of importance, include: Specialized Experience and Technical Competence (max 5 projects), Professional Qualifications of Key Personnel, Capacity to Accomplish Work in Required Time, Location in the General Geographical Area and Knowledge of Locality, and Past Performance. Offerors must be actively registered in SAM.gov and acknowledge all amendments, including Amendment 0001 which added a Q&A document.

Key Dates & Contacts

  • SF330 Qualification Due Date: May 26, 2026, 12:00 PM MT
  • Primary Contact: Matthew Gilger (mgilger@blm.gov, 720-682-6736)

Additional Notes

The Tomahawk Detention Dam is classified as Low Hazard and is designed not to retain a dead pool.

People

Points of Contact

Gilger, MatthewPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 2Viewing