Buckley SFB Rectifier Inverter System Replacement

SOL #: FA2543RectifierSources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA2543 460 CONS
BUCKLEY AFB, CO, 80011-9572, United States

Place of Performance

Aurora, CO

NAICS

All Other Miscellaneous Electrical Equipment and Component Manufacturing (335999)

PSC

Converters, Electrical, Nonrotating (6130)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 19, 2026
2
Last Updated
Mar 25, 2026
3
Response Deadline
Apr 2, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, on behalf of the US Space Force, is conducting a Sources Sought for market research to identify capable vendors for the Buckley SFB Rectifier Inverter System Replacement in Aurora, CO. This is a Total Small Business Set-Aside. Responses are due by April 2, 2026.

Purpose

This Sources Sought aims to gather information from industry to identify qualified vendors and obtain feedback for the complete replacement of the rectifier/inverter system at the US Space Force Buckley Space Force Base DISA node facility (Building 730, Room 132). The existing system sustained significant damage due to a major water main break.

Scope of Work

The requirement is for the full replacement of the existing rectifier/inverter/power distribution system. This includes new battery strings, battery disconnects, and A/C power circuits. The system provides stable, reliable power for DoD long-haul communications by converting commercial, generator, and uninterruptable power supplies to direct current (DC).

Key Requirements include:

  • A complete replacement system meeting or exceeding 2,800 amps (200 amps x 14 units).
  • Batteries equivalent to or better than C&D Technologies MS Endur II (3 strings with 48 jars per string).
  • Battery disconnects equivalent to or better than Peco II, -48v 1800 amp units.
  • New power distribution to the DC breaker panel (loads A, B, C, D) from commercial, battery, and generator sources, meeting or exceeding Lorain Power System Model 1231v1.
  • Power must feed into sectors A, B, C, D, E, and F of the DC breaker panel.
  • The inverter system must accommodate existing DC breaker panels and A/C circuits.

Information Requested from Vendors

Respondents are asked to provide:

  • Company Information: Name, address, CAGE, UEI, contact person, business size, and socioeconomic categories.
  • Statement of Need Feedback: Identify unclear specifications, missing critical components, or recommendations for improvement.
  • Technical Capability: Describe expertise, equipment, resources for the full replacement, general approach to designing/integrating a power rectification and distribution system, and installation methodology (minimizing disruption).
  • Past Performance: Examples of similar projects within the last 5 years, especially for DoD or federal agencies.
  • Delivery/Installation: Estimated lead time for equipment delivery and installation timeline.
  • Price Estimate: A Rough Order of Magnitude (ROM) price for the complete solution.

Contract & Timeline

  • Type: Sources Sought (Market Research)
  • Set-Aside: Total Small Business
  • Response Due: April 2, 2026, 2:00 PM UTC
  • Published Date: March 25, 2026

Place of Performance

Buckley Space Force Base, Aurora, CO, United States.

Contact Information

All communications should include both:

People

Points of Contact

Maurice EppsPRIMARY
Matt Kennedy, TSgtSECONDARY

Files

Files

Download
Download

Versions

Version 2Viewing
Sources Sought
Posted: Mar 25, 2026
Version 1
Sources Sought
Posted: Mar 19, 2026
View
Buckley SFB Rectifier Inverter System Replacement | GovScope