Bridgeport Warehouse Snow Damage Repair and Mitigation

SOL #: 1240LT26C0020Award Notice

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 8
Ogden, UT, 844012310, United States

Place of Performance

CA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Other Administrative Facilities And Service Buildings (Z1AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 11, 2026
2
Last Updated
May 13, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service issued a Total Small Business Set-Aside solicitation for Boiler Room Interior Reconstruction, Boiler Replacement, and Electrical Upgrades at the Buffalo Creek Work Center in Pine, CO. This opportunity, which has since resulted in a Firm Fixed Price award, sought contractors to address snow damage and upgrade critical infrastructure. Proposals were due March 13, 2026, and the award notice was published on May 13, 2026.

Scope of Work

The awarded project involved comprehensive repairs and upgrades:

  • Boiler Replacement: Supply and install one high-efficiency propane gas-fired boiler (e.g., Dunkirk Quantum 90, Q90-200), including associated plumbing and electrical components. This also included replacing a backflow preventer and specific copper water lines.
  • Electrical Upgrades: Convert two outdated electrical panels to one new, code-compliant panel with proper grounding. Existing systems included a Federal Pacific Stab-lok panel (identified as a potential fire hazard) and an entryway subpanel lacking grounding.
  • Mold Remediation: Perform mold remediation in the boiler room due to water damage, involving removal of contaminated materials, cleaning, and antimicrobial treatment.
  • Boiler Room Reconstruction: Reconstruct the boiler room interior post-mitigation, including insulation, plywood installation, painting, and final cleaning.
  • Option Item: Thermostat replacement, contingent on contractor examination of existing units.

Work was required to comply with manufacturer recommendations, the International Mechanical Code (IMC), International Building Code, International Plumbing Code, National Electric Code, and OSHA Construction Industry Regulations.

Contract Details

  • Contract Type: Firm Fixed Price.
  • Set-Aside: 100% for Total Small Business Concerns.
  • Estimated Magnitude: Between $25,000 and $100,000.
  • Period of Performance: Estimated April 1, 2026, through May 20, 2026.
  • Place of Performance: Buffalo Creek Work Center, 18046 Co Rd 126, Pine, CO 80470.
  • Bonds: Performance & Payment Bonds (100% of award price) were required within 10 days of award.

Submission & Evaluation (Historical)

  • Quote Due Date: March 13, 2026, by 12:00 p.m. Central Time.
  • Submission Requirements: Included Experience/Past Performance (max 3 pages), Written Technical Approach (2-4 pages with construction schedule), and Attachment 2 - Schedule of Items with Prices.
  • Evaluation Criteria: Award was made to the offeror representing the best value, based on Factor 1 (Experience/Past Performance), Factor 2 (Technical Approach), and Factor 3 (Price).
  • Questions Deadline: March 4, 2026, by 12:00 PM Central Time.
  • Site Visit: A pre-bid site visit was held on February 25, 2026, at 1:00 PM Mountain Time.

Key Clarifications

  • Amendment A0001 posted Q&A and the Site Visit Sign-In sheet on March 11, 2026.
  • Clarifications included painting requirements, availability of temporary power (no generator needed), and confirmation of two thermostats for optional replacement.
  • A General Decision Number (GDN) for wage determination for residential construction in Colorado was applicable, outlining prevailing wage rates and fringe benefits.

Contact Information

Primary Contact: Tony Taylor, Contract Specialist (tony.taylor@usda.gov).

People

Points of Contact

Tony Taylor Contract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Award Notice
Posted: May 13, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 11, 2026
View
Bridgeport Warehouse Snow Damage Repair and Mitigation | GovScope