Building FC371 and FC372 Paint and Flooring Repairs
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVFAC SYSCOM MID-ATLANTIC, is soliciting proposals for Building FC371 and FC372 Paint and Flooring Repairs at Marine Corps Base Camp Lejeune, NC. This is a Total Small Business Set-Aside opportunity, exclusively open to M&R MACC Contractors listed on the General Requirements cover page. The estimated cost range for this project has been updated to $1,000,000 - $5,000,000. Proposals are due by June 11, 2026, at 2:00 PM EST.
Scope of Work
This project involves comprehensive preparation, painting, and replacement of flooring systems within Buildings FC371 and FC372. Key aspects include:
- Paint and Flooring Replacement: Prep, paint, and replace flooring systems in specified buildings.
- Field Verification: All measurements provided are for reference only; contractors must field-verify all quantities and conditions.
- Operational Environment: Facilities will remain operational throughout the construction period, requiring minimal interference with normal activities.
- Furniture Movement: The contractor is responsible for moving furniture and other objects within rooms.
- Protection: Existing work must be protected, and altered portions repaired or replaced to match or exceed pre-existing conditions.
- Environmental Compliance: Adherence to the "Contractor Environmental Guide" for MCB Camp Lejeune is mandatory, covering hazardous materials, waste management, and other environmental regulations.
Key Specifications & Quantities
Detailed specifications are provided for materials, including paint (e.g., Benjamin Moore, Sherwin Williams specific colors), Luxury Vinyl Tile (LVT), Epoxy Resinous Flooring, and other finishes (e.g., rubber base, transition strips, corner guards). Quantities for both buildings include approximately 136,903 SF of paint, 32,863 SF of LVT flooring, 8,215 LF of flooring cove base, and repairs/replacements for 300 interior doors, 123 exterior doors, and 103 windows.
Contract Details
- Contract Type: Combined Synopsis/Solicitation (RFP N4008526R9036)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Estimated Cost Range: $1,000,000 - $5,000,000 (updated by Amendment 0001)
- Contract Completion Date: 540 days after award.
- Liquidated Damages: $880 per Calendar Day.
- Bond Requirements: Bid bond (20%), payment bond, and performance bond required for proposals valued at $150K and greater.
- Wage Determination: General Decision Number NC20260010 dated 01/02/2026.
Submission & Evaluation
- Proposal Due Date: June 11, 2026, at 2:00 PM EST.
- Submission Method: Via email to sharon.e.humphrey.civ@us.navy.mil and regenia.d.guest.civ@us.navy.mil.
- Requests for Information (RFIs) Due: June 01, 2026, at 3:00 PM EST, to sharon.e.humphrey.civ@us.navy.mil.
- Basis for Award: Lowest Price.
- Proposal Acceptance Period: 60 days from receipt of offers.
- Site Visit: Scheduled for May 7, 2026, at 0900 at building FC371, Camp Lejeune, NC.
- Eligibility: Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal.
Additional Notes
Funding availability is not guaranteed. The solicitation includes provisions for Buy American Requirements and Executive Order 13706 (Paid Sick Leave). Submittal Registers (SR) are provided for tracking required documentation throughout the project lifecycle.