BUSHING,SLEEVE

SOL #: N0010426QFC87Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP WEAPON SYSTEMS SUPPORT MECH
MECHANICSBURG, PA, 17050-0788, United States

Place of Performance

Place of performance not available

NAICS

Ball and Roller Bearing Manufacturing (332991)

PSC

Bearings, Plain, Unmounted (3120)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 6, 2026
2
Last Updated
May 7, 2026
3
Submission Deadline
May 12, 2026, 8:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVSUP WEAPON SYSTEMS SUPPORT MECH is soliciting proposals for the manufacturing and delivery of BUSHING,SLEEVE (Hull Stem Sleeve). This requirement is for SPECIAL EMPHASIS material critical for shipboard systems, demanding stringent quality assurance and certification. This is a Total Small Business Set-Aside. Proposals are due May 12, 2026, at 4:30 PM local time.

Scope of Work

The opportunity requires the manufacturing of Hull Stem Sleeves in accordance with NAVSEA Drawing 803-5959302, Item 11, and General Notes Drawing 803-5959311. The material must conform to EB Spec 3644, as modified. Key requirements include:

  • Material Certification: Quantitative chemical and mechanical analysis.
  • Testing: Dye Penetrant Inspection, Radiography (per T9074-AS-GIB-010/271 and MIL-STD-2035), and Non-Destructive Tests for weld repair.
  • Welding/Brazing: Adherence to S9074-AR-GIB-010A/278, 0900-LP-001-7000, or S9074-AQ-GIB-010/248, with required procedure and qualification data submission.
  • Configuration Control: Maintenance of total equipment baseline configuration, with specific procedures for Waivers/Deviations and Engineering Change Proposals (ECPs).
  • Mercury Free: Strict prohibition of mercury and mercury-containing compounds.

Contract & Timeline

  • Type: Solicitation
  • Set-Aside: Total Small Business
  • Response Due: May 12, 2026, 4:30 PM local time (latest amendment)
  • Published: May 7, 2026
  • Delivery: Final material delivery is required on or before 365 days after the contract effective date. Certification Data CDRLs are due 20 days prior to scheduled delivery.

Key Requirements

  • Quality System: Contractors must maintain a quality system in accordance with ISO-9001, amplified by ISO-10012 or ANSI-Z540.3 with ISO-17025, or MIL-I-45208. Government Quality Assurance at source is required.
  • Traceability & Certification: Strict material traceability and certification are mandatory for Level I/SUBSAFE systems, including chemical, mechanical, and NDT certifications. Electronic signatures are accepted under specific controls.
  • Submission: All certification data and receiving reports must be submitted via Wide Area Work Flow (WAWF). "Ship to" N50286, "Inspect by" N39040, "Accept by" N39040, with email notification to PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL. No material is to be shipped prior to acceptance.
  • Security: This requirement involves access to NOFORN and/or Naval Nuclear Propulsion Information. Offerors must download and email a completed security agreement form to ashton.k.perry.civ@us.navy.mil to obtain drawings.

Additional Notes

This is a DO rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). Portsmouth Naval Shipyard's DODAAC has changed to N50286. The Electronic Contractor Data Submission (ECDS) system is available for certain data submissions and inquiries.

People

Points of Contact

ASHTON.K.PERRY.CIV@US.NAVY.MILPRIMARY

Files

Files

View
View
Download
Download
View
Download
Download
View

Versions

Version 7Viewing
Solicitation
Posted: May 7, 2026
Version 6
Solicitation
Posted: May 6, 2026
View
Version 5
Solicitation
Posted: Apr 30, 2026
View
Version 4
Solicitation
Posted: Apr 20, 2026
View
Version 3
Solicitation
Posted: Mar 12, 2026
View
Version 2
Solicitation
Posted: Mar 11, 2026
View
Version 1
Solicitation
Posted: Mar 6, 2026
View