C--Rehabilitate Buzzard Point Park
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Interior (DOI), National Park Service (NPS), through the Interior Business Center (IBC), is soliciting proposals for Title I & II Architect-Engineer (AE) services for the Rehabilitation of Buzzard Point Park within Anacostia Park, Washington, D.C. This is a Total Small Business Set-Aside under NAICS 541320 (Landscape Architecture). An amendment has extended the proposal due date. Responses are now due April 29, 2026.
Scope of Work
This opportunity requires comprehensive AE services for the planning, design, and preparation of construction documents for the 3.3-acre Buzzard Point Park. Key tasks include site investigations, geotechnical surveys, design alternative development, feasibility studies for living shorelines and restroom facilities, public engagement, and ensuring compliance with various codes and standards (e.g., ABAAS, sustainable design, NPS lighting standards). The project aims to transform the park into an accessible community waterfront amenity, extend the Anacostia Riverwalk Trail, and provide recreational opportunities. The estimated construction contract price is over $10 million, with the AE fee capped at 6% of this estimate.
Contract Details
- Contract Type: Firm-Fixed Price (FFP)
- Period of Performance: 744 calendar days from award
- Set-Aside: Total Small Business (FAR 19.5)
- NAICS: 541320 - Landscape Architecture (Size Standard: $9M)
- Place of Performance: Buzzard Point Park, Washington, D.C.
- Key Personnel: Must include a Principal Landscape Architect, Project Architect, and Engineers licensed in D.C.
Submission & Evaluation
Proposals must be submitted electronically using Standard Form 330 (SF330), Parts I and II. Evaluation will focus on demonstrated competence and qualifications, including professional qualifications, specialized experience (e.g., urban parks, environmental engineering, high-quality visualizations), capacity to accomplish work, past performance, and location. Offerors must be licensed and registered to work in Washington, D.C., and registered in SAM.
Key Dates
- Original Solicitation Published: March 3, 2026
- Amendment 0001 Published: April 2, 2026
- Questions Due Date: March 13, 2026 (Responses forthcoming)
- Proposal Due Date: April 29, 2026, at 2:00 PM ET (Extended by Amendment 0001)
Attachments & Notes
Key attachments include the Statement of Work (SOW), Past Performance Questionnaire (PPQ), 30% Plans, and an Environmental Assessment (EA). The EA evaluates alternatives for park improvements, with Alternative B, Option 2 (shoreline reconstruction, ART extension, railing, overlook) being the preferred approach. The PPQ outlines specific criteria for past performance evaluation. Contact Ericka Graham at ericka_graham@ibc.doi.gov for inquiries.