CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, is soliciting bids for road improvements within the Mojave National Preserve in San Bernardino County, CA. This Invitation for Bid (IFB) covers approximately 56.5 miles of roads, including Kelso-Cima, South Kelbaker, and Morningstar Mine Roads, with an estimated cost between $80,000,000 and $120,000,000. The solicitation is conducted under Full and Open Competition with HUBZone Price Preference. Bids are due May 19, 2026.
Scope of Work
The project involves resurfacing, restoration, and rehabilitation to improve safety and visitor access. Key work includes:
- Kelso-Cima and South Kelbaker Roads: Full depth reclamation of existing pavement, placement of new asphalt, widening to a consistent 26 feet, minor horizontal/vertical realignment, reinforcing 48 low water crossings, and improving safety with mumble strips, signing, pavement markings, and paved pullouts. Two equal 1.5-inch lifts of asphalt concrete pavement are required.
- Morningstar Mine Road: Full depth reclamation of existing pavement and placement of surface-course aggregate.
- Principle Work Items: 110,000 tons of asphalt concrete pavement, 133,000 tons of roadway aggregate, 81,000 tons of aggregate surface course, 110,000 cubic yards of roadway excavation, 49 miles of full depth reclamation, 17,000 linear feet of concrete barrier, 44 miles of tortoise barrier fence, 2,400 linear feet of tortoise crossing structure, and 12,000 cubic yards of rip rap.
Contract & Timeline
- Type: Invitation for Bid (IFB), Firm Fixed Price with Economic Price Adjustment.
- Estimated Value: $80,000,000 - $120,000,000.
- Set-Aside: Full and Open Competition with HUBZone Price Preference (10% price evaluation factor for non-HUBZone offers).
- NAICS: 237310 (Highway, Street & Bridge Construction), $45M size standard.
- Bid Opening Date: May 19, 2026.
- Anticipated NTP: July 20, 2026.
- Period of Performance: Approximately 2.5 working years from NTP.
- Amendments: Multiple amendments (A001-A005) have been issued, modifying bid schedules, technical specifications, and deadlines.
Evaluation
Award will be based on full and open competition, with a 10% price preference applied to non-HUBZone offers. Prior experience on projects of similar magnitude is required. A Project Labor Agreement (PLA) is also required.
Key Requirements & Clarifications
- Environmental: Work is in a natural resource sensitive area. Tortoise barrier fence must be installed prior to other ground-disturbing activities. A temporary asphalt plant is not permitted within Mojave National Preserve.
- Materials: Section 301 Aggregate Base items will be deleted and quantities added to Section 302, allowing reuse of existing asphalt and aggregate. Liquid anti-strip additive is not allowed in asphalt mix; lime must be used.
- Railroad: Work within 25 feet of UPRR tracks requires railroad-approved flagmen and Right of Entry Agreements.
- Morning Star Mine Road: Will remain open to public traffic but closed to through traffic after project completion.
- Digital Files: LandXML files are provided and can be converted to DGN/DWG CAD files.
- Submission: Electronic bids are encouraged; hard copy bids can be hand-delivered. A Bid Guarantee is required. Offerors must have an active SAM registration.
Submission Impact
Bidders must acknowledge all amendments (A001-A005) and utilize the latest bid schedules provided in Amendment A005. Failure to acknowledge amendments may result in bid rejection.