Cattle Egret Habitat Removal
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, 82d Contracting Squadron at Sheppard AFB, TX, is soliciting Firm-Fixed-Price (FFP) quotes for Cattle Egret Habitat Removal services. This Total Small Business Set-Aside opportunity requires tree removal on two (2) private, off-base properties in Wichita Falls, TX, to support the Bird/Wildlife Aircraft Strike Hazard (BASH) Program. Quotes are due by March 20, 2026, at 10:00 AM CT.
Scope of Work
The contractor will provide all personnel, equipment, tools, and supervision to execute vegetation removal, primarily via cut-stump herbicide treatments, on approximately 0.8 acres across two distinct off-base properties (Site A and Site C). This includes mulching woody debris on-site or arranging for legal off-site disposal, and removing/replacing approximately 320 feet of engulfed livestock fencing on Property C. All tree felling must be completed by April 1, 2026, to avoid nesting activity. Work must comply with Texas State Law, Federal Law (Migratory Bird Treaty Act), and the "Empty Nest Policy." A valid Commercial Pesticide Applicator License from the Texas Department of Agriculture is required.
Contract Details
- Contract Type: Firm-Fixed-Price (FFP)
- Solicitation Type: Request for Quotation (RFQ)
- NAICS Code: 561730 (Small Business Size Standard: $9.5M)
- Set-Aside: Total Small Business Set-Aside
- Period of Performance: 30 calendar days from Notice to Proceed.
- Place of Performance: Two off-base locations in Wichita Falls, TX (Site A and Site C).
- Funding Note: Funds are not presently available; award is contingent upon fund availability. The Government reserves the right to cancel.
Submission & Evaluation
- Mandatory Site Visit: A mandatory site visit was held on March 6, 2026, at 1300 CT. Failure to attend renders a proposal technically unacceptable.
- Questions Due: March 10, 2026, 10:00 AM CT (already passed).
- Quotes Due: March 20, 2026, 10:00 AM CT.
- Submission Method: Email quotes to Cole Jones (cole.jones.6@us.af.mil) and Joshua Mills (joshua.mills.20@us.af.mil).
- Evaluation Criteria: Best value to the Government, considering Technical Capability, Price, and Past Performance. Quotes must be valid for 90 days.
Key Amendments & Clarifications
- Site Scope Change: Property B has been removed from the scope; work will only be performed on Site A and Site C.
- Felling Deadline: All tree felling must be completed by April 1, 2026.
- Pesticide License: Contractors must possess a valid Commercial Pesticide Applicator License from the Texas Department of Agriculture.
- Stump Height: Desired stump height is two inches or lower, with latitude for impractical cuts agreed upon by the government.
- Herbicide: Garlon 4 Ultra Herbicide is the only authorized herbicide.