Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers, Rock Island District, is soliciting bids for the Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station in Cedar Rapids, IA. This Unrestricted Invitation for Bid has an estimated value between $25,000,000 and $100,000,000. Bids are due March 18, 2026, at 1:00 PM CST.
Scope of Work
The project involves comprehensive construction activities including site demolition; temporary traffic controls; clearing, grubbing, and stripping; removal of pavement, levee, and utilities; construction of rigid and flexible pavements; installation of storm sewers, manholes, and catch basins; and the construction of a cast-in-place concrete floodwall, storm sewer outlets, gate wells, geotechnical instrumentation, relief wells, trench and toe drains, and a pump station.
Contract Details
- Contract Type: Unrestricted Invitation for Bid (IFB)
- NAICS Code: 237990 (Size Standard: $45,000,000)
- Estimated Range: $25,000,000 to $100,000,000
- Completion Days: 970 consecutive calendar days (updated by Amendment 0001)
- Project Labor Agreement (PLA): The requirement for a PLA has been removed (Amendment 0003).
Key Amendments & Updates
- Amendment 0001: Extended contract completion to 970 days and adjusted due dates.
- Amendment 0002: Indefinitely suspended bid submission and opening dates, added FAR Clause 52.219-4, and updated bid package submission instructions.
- Amendment 0003: Removed the Project Labor Agreement requirement, re-opened the Q&A period, and re-established new due dates for bids and bid opening. It also updated plans, specifications, and wage determinations.
- Amendment 0004: Updated Plans and Specifications based on questions received, including revised Schedule of Prices, Project Table of Contents, and various sections and drawings.
Submission & Questions
- Bid Submission Due: March 18, 2026, at 1:00 PM CST.
- Bid Opening: March 18, 2026, at 2:00 PM CST (Virtual, Phone: 503-207-9433, Access Code: 759 365 344#).
- Questions Due: March 2, 2026, at 2:00 PM CST via ProjNet.
- Required Files: Due to file sizes, the full Solicitation with Specifications and Attachment J-2 Plan Set - VOL 401 Floodwall are not posted on SAM.gov. Email Samantha Johanson (samantha.k.johanson@usace.army.mil) and Brunson Grothus (brunson.e.grothus@usace.army.mil) for a DoD SAFE link to these files.
- Site Visit: A site visit was conducted on December 2, 2025.
Relevant Documents
Recent amendments have significantly revised various sections and drawings. Bidders must review the latest versions, including:
- Amendment 0004: Revised Schedule of Prices, Project Table of Contents, Sections 01 20 00, 01 33 00, 01 45 00, and drawings (VOL 401 Floodwall Rev3).
- Amendment 0003: Revised Schedule of Prices, Project Table of Contents, Sections 01 20 00, 01 33 00, 02 21 00, 03 20 01, 05 50 15, 13 50 00, 32 01 20, 32 12 10, 32 12 16, 32 13 13, 33 46 10, 31 00 00, and drawings (VOL 403 Pump Station Rev1, VOL 401 Floodwall Rev2, Reference Plan Set 2).
- Wage Determination: The most current version (Attachment J-1 Wage Determination Rev1) must be used for labor cost estimation.
- Bid Summary Sheet: Posted in the Attachments section.