CHASSIS ASSEMBLY
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, has issued a Solicitation for the repair of CHASSIS ASSEMBLY components. This amendment extends the due date for re-quotes. The requirement is planned for FY26.
Scope of Work
This contract covers the repair and quality requirements for CHASSIS ASSEMBLY components. Contractors must ensure repairs meet operational and functional requirements as represented by the specified Cage Code/Reference Number (51398 L-ACE00039-S160), adhering to their standard repair practices, manuals, and directives. Items must be marked in accordance with MIL-STD-130, REV N, 16 NOV 2012, and must be mercury-free for use on submarines/surface ships. Any changes in design, material, servicing, or part number require Contracting Officer approval, with detailed explanations and drawings provided by the contractor.
Contract Details & Timeline
- Opportunity Type: Solicitation
- Set-Aside: None specified
- Requirement: Repair of CHASSIS ASSEMBLY for FY26
- Freight: FOB Origin
- Inspection: Government Source Inspection (GSI) is required.
- Award Type: Resultant award will be issued bilaterally, requiring contractor's written acceptance.
- Response Due: May 8, 2026, 8:30 PM EDT
- Published Date: May 6, 2026
Submission Requirements
Quotes must include:
- Unit Price and Total Price
- Informal Cost Breakdown (if applicable)
- Repair Turnaround Time (RTAT) in days. RTAT is measured from physical receipt of the F-condition asset at the contractor's facility (as reflected in the Commercial Asset Visibility (CAV) system) to the date of asset acceptance by the Government.
- Awardee CAGE, Inspection & Acceptance CAGE (if different), and Facility/Subcontractor CAGE (where asset should be shipped, if different).
- Crucially, only authorized distributors of the original manufacturer's item will be considered. Proof of authorized distributorship on company letterhead, signed by a responsible official, must accompany the offer.
Quality Assurance & Packaging
The contractor is responsible for performing all inspection requirements and ensuring compliance with contract terms. Records of inspection work must be maintained for 365 days post-delivery. Inspection and testing of repaired items must follow original manufacturer's specifications and drawings. Packaging shall be in accordance with MIL-STD 2073.