CMR ELECTRIC ROOM SAFETY UPGRADE

SOL #: PR15922520Combined Synopsis/Solicitation

Overview

Buyer

State
State, Department Of
US EMBASSY BOGOTA
WASHINGTON, DC, 20520, United States

Place of Performance

BOGOTA, CO-DC, Colombia

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electric Wire, And Power And Distribution Equipment (N061)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 10, 2026
2
Last Updated
May 5, 2026
3
Submission Deadline
May 7, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Embassy Bogota, Colombia (Department of State) is soliciting offers for a CMR Electric Room Safety Upgrade. This project involves the relocation of the Main Distribution Panel (MDP), installation of transfer switch and auxiliary panels, and reorganization of electrical wiring to modernize facilities, enhance safety, and ensure regulatory compliance. This is a Request for Quotation (RFQ) primarily for Colombian Vendors. Offers are due by May 5, 2026, at 4:00 PM (Bogota time).

Scope of Work

The project requires the relocation of the MDP and associated panels, reorganization of existing electrical wiring, and installation of new cable tray routes and conduits. Key tasks include planned disconnection/reconnection of circuits, provision of temporary power, final connection and testing, and installation of new electrical lighting panels. Compliance with Colombian (RETIE, NTC) and international (NEC, IBC, OBO, NFPA 70E) standards is mandatory. Specific technical requirements include a three-phase 11.4 kV service, grounding system, lightning protection, and differential protection for wet locations.

Contract Details

  • Contract Type: Request for Quotation (RFQ)
  • Eligibility: Primarily for Colombian Vendors (prices in COP). U.S. vendors may submit in USD, but prices must be DDP at the Embassy warehouse in Bogota, and no tax exemption will be issued for Colombian taxes.
  • Period of Performance: A 30-day schedule is suggested for key milestones.
  • Safety Requirements: Contractors must comply with stringent safety, health, and environmental management programs, adhering to the more restrictive of U.S. Army Corps of Engineers' EM 385-1-1 or Colombian industrial safety laws. The Contracting Officer's Representative (COR) will oversee compliance.
  • NDAA Compliance: Bidders must complete and submit certifications regarding the use of certain telecommunications and video surveillance services or equipment as per FAR clauses 52.204-24, 52.204-25, and 52.204-26.

Submission & Evaluation

  • Proposal Requirements: Offers must include prices in COP (or USD for U.S. vendors DDP Bogota), technical information, evidence of meeting requirements, general liability insurance (for construction services), past experience, financial resources, warranty terms, and a statement certifying understanding of the requirement. Offers must be valid for six (6) months.
  • Evaluation Criteria: Will consider compliance with requirements, technical description, past experience, financial resources, and warranty terms.

Key Dates & Actions

  • Site Visit: April 29, 2026, at 09:00 hours. Register by April 24, 2026, at 12:00 (noon) by emailing BogotaGSOcompras@state.gov with PR15922520 in the subject line.
  • Questions Due: May 1, 2026, at 4:00 PM (Bogota time) via email to bogotagsocompras@state.gov.
  • Offer Submission Deadline: May 5, 2026, at 4:00 PM (Bogota time) via email to bogotagsocompras@state.gov, using PR15922520 in the subject line.

Clarifications from Q&A

Key clarifications include technician accreditation (CONTE certification based on experience is acceptable), grounding grid verification, drywall partition dimensions, access door specifications, DBA line item requirements, relocation of pump control panels, USG-provided temporary storage, strict service interruption windows (max 20 minutes, no outages during diplomatic events), and coordination for critical circuits. As-built drawings are not available; the intervention area is limited to the electrical room and exterior grounding system.

People

Points of Contact

Bogota Contracting OfficePRIMARY

Files

Files

Download
Download
Download
Download

Versions