Columbine Gravel Pit Crushing and Development

SOL #: 1240LT26Q0064Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 8
Ogden, UT, 844012310, United States

Place of Performance

Montrose, CO

NAICS

Other Crushed and Broken Stone Mining and Quarrying (212319)

PSC

Mineral Construction Materials, Bulk (5610)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 28, 2026
2
Submission Deadline
Jun 10, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for the Columbine Gravel Pit Crushing and Development project in Montrose County, Colorado. This Total Small Business Set-Aside opportunity requires a contractor to provide all equipment, tools, personnel, and labor for gravel crushing, site development, excavation, embankment, drainage, dewatering, and stockpiling aggregate materials. The estimated project magnitude is between $250,000 and $500,000. Proposals are due June 10, 2026, at 11:00 AM CT.

Scope of Work

The contractor will be responsible for the continued development of the Columbine Gravel Pit. Key tasks include:

  • Excavation and Embankment: Removal and stockpiling of overburden soils, followed by spreading and seeding disturbed areas.
  • Drainage and Dewatering: Sloping the pit to ensure proper drainage (2-4%) and dewatering previous excavation areas.
  • Crushing and Stockpiling: Crushing and stockpiling approximately 16,000 tons of aggregate materials (Grading Designation G, 1.0 inch minus) in accordance with Forest Service Supplemental Specifications (FSSS).
  • Testing: Performing aggregate material testing as per FSSS.
  • Site Development: General site development, including adherence to a Pit Development Plan outlining excavation limits, stockpile areas, and slope requirements.

Contract Details

  • Contract Type: Firm Fixed Price
  • Period of Performance: July 6, 2026, to October 15, 2027
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 212319 – Other Crushed & Broken Stone Mining (Size Standard: 550 Employees)
  • Place of Performance: Columbine Gravel Pit, Ouray Ranger District, Grand Mesa, Uncompahgre and Gunnison National Forests, Montrose County, Colorado.

Key Requirements & Specifications

  • Work must adhere to Plans and Drawings, FSSS, Schedule of Items (SOI), and Statement of Work (SOW).
  • FSSS Modifications: Significant revisions to standard specifications (FP-24) cover control of work/materials, measurement/payment, quality control, excavation, stockpiled aggregates (including MSHA compliance), turf establishment, and aggregate properties. Crushing operations are restricted to May 15th - November 15th.
  • Sustainable Products: Compliance with Bio-Preferred Program Requirements (FAR 52.223-1, 52.223-2) for biobased materials in operations, maintenance, and construction.
  • Wage Determination: Adherence to General Decision Number CO20260003 for prevailing wage rates for heavy construction in Colorado.
  • Quality Control: Contractor must provide an acceptable Quality Control Plan and maintain daily maintenance logs.
  • Noxious Weed Prevention: All equipment must be cleaned before entering public lands.
  • Belt-Conveyor Scale Systems: Compliance with Handbook 44 – 2016, Section 2.21 specifications if applicable.

Submission & Evaluation

  • Questions Due: May 21, 2026, at 11:00 AM CT.
  • Site Visit: May 15, 2026, at 11:00 AM MT (highly encouraged; contact Contracting Officer Representative and Contracting Officer to confirm attendance).
  • Proposals Due: June 10, 2026, at 11:00 AM CT.
  • Evaluation: Comparative methodology based on Technical Approach (2-4 pages, construction schedule) and Past Performance (similar contracts within 5 years, references), aiming for best value. Formal trade-off procedures will not be conducted.
  • Pricing: Must be submitted on the provided Excel Spreadsheet "Attachment 2 – Schedule of Items" and rounded to the nearest whole dollar.
  • Page Limit: Quotes are limited to 10 pages, excluding the Schedule of Items.
  • Bonds: A bid bond/offer guarantee (20% of total offer price, max $3 million) is required. 100% Payment and Performance Bonds are required within 10 calendar days after award.
  • Amendments: Offerors must acknowledge all amendments.

People

Points of Contact

Lucas DahlmanPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
Columbine Gravel Pit Crushing and Development | GovScope