Combined Synopsis/Solicitation Refractory Metal Wires

SOL #: SP800026R0007Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DCSO COLUMBUS DIVISION #3
FORT BELVOIR, VA, 22060-6223, United States

Place of Performance

NY

NAICS

Nonferrous Metal (except Aluminum) Smelting and Refining (331410)

PSC

Nonferrous Base Metal Refinery And Intermediate Forms (9650)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 10, 2026
2
Last Updated
Apr 3, 2026
3
Submission Deadline
Apr 3, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Strategic Materials, through DCSO Columbus Division #3, has issued a Combined Synopsis/Solicitation (SP8000-26-R-0007) for the purchase of Refractory Metal Wires and TZM alloys. This Firm-Fixed Price contract is a one-time buy with a five-year delivery period, intended to replenish the National Defense Stockpile. The acquisition is conducted under Other Than Full and Open Competition and is not set aside for small businesses. Proposals are due April 3, 2026, at 5:00 PM EST.

Scope of Work

The requirement is for various types of refractory metal wires, billets, bars, and ingots, including TZM Billet Type 1-4, Arc Cast TZM Ingot/Billet/Bar, W Wire, Mo-K Wire, W-Mo Wire, Mo-La Wire, Mo Wire, and W-K Wire. These materials must meet stringent chemical and physical specifications detailed in the Statement of Work (SOW). All delivered materials require form and packaging suitable for long-term storage in an enclosed Government warehouse at the DLA Strategic Materials Scotia Depot in Scotia, NY. The contractor is responsible for transportation (CIF) and must submit a material delivery schedule within 30 business days of award, with individual deliveries scheduled 15 business days in advance.

Contract Details

  • Contract Type: Firm-Fixed Price (FFP)
  • Delivery Period: 5 years (60 months maximum)
  • Set-Aside: Not set aside (Other Than Full and Open Competition)
  • NAICS: 331410 – Nonferrous Metal (except Aluminum) Smelting and Refining (Size Standard: 1,000 employees)
  • Place of Performance: DLA Strategic Materials Scotia Depot, Scotia, NY
  • Eligibility: Offerors must be registered and maintain an ACTIVE status in SAM.

Submission & Evaluation

  • Proposal Submission Deadline: April 3, 2026, 5:00 PM EST
  • Questions Deadline: February 17, 2026, 3:00 PM EST (submit via Attachment 4 – Q&A Matrix Template)
  • Submission Method: Electronically via email to Adam Steele (Adam.Steele@dla.mil) and Iván Badillo (Ivan.Badillo@dla.mil).
  • Evaluation Criteria: Award will be based on a responsible offeror whose proposal is technically acceptable and most advantageous to the Government, considering price and other factors. Technical Acceptability is the sole non-price evaluation factor.
  • Proposal Validity: Must be valid for 180 calendar days after the close of the notice.

Additional Notes

This solicitation has undergone multiple amendments, with the latest (Amendment 0004) updating the Statement of Work. The Justification for Other than Full and Open Competition indicates Elmet Technologies LLC as the only available domestic source, though market research for additional sources is ongoing. Offerors must mark each page of their quote with "Source Selection Information."

People

Points of Contact

Ivan BadilloSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Mar 17, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 24, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 10, 2026
View