COMPRESSOR,MARC350A
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mech, is seeking quotes for the repair of COMPRESSOR,MARC350A. This Request for Quotation (RFQ) is issued under Emergency Acquisition Flexibilities (EAF), encouraging accelerated delivery. Quotes are due by May 1, 2026.
Scope of Work
The requirement is for the repair of the COMPRESSOR,MARC350A, ensuring it meets operational and functional requirements specified by Cage Code 28953 and Reference Number 35657. All repair work must adhere to the contractor's standard practices, manuals, and directives, including technical orders and approved repair standards. Items must be marked in accordance with MIL-STD-130, REV N. Any changes in design, material, servicing, or part number require prior approval from NAVICP-MECH. The Government is seeking a Repair Turnaround Time (RTAT) of 90 days, measured from asset return to acceptance. Government Source Inspection (GSI) is required. Packaging must comply with MIL-STD 2073.
Contract & Timeline
This is a Solicitation for a bilateral award, requiring the contractor's written acceptance. The Government intends to add an option for increased quantity. Pricing options include Firm-Fixed-Price, Estimated, or Not-to-Exceed (NTE).
- Response Due: May 1, 2026, by 4:30 PM Local Time.
- Published: May 6, 2026.
- Set-Aside: None specified.
Submission Requirements & Evaluation
Quotes must include:
- Unit Price and Total Price.
- Proposed Repair Turnaround Time (RTAT). If exceeding 90 days, provide capacity constraints.
- T&E fee/price if an asset is determined Beyond Repair (BR/BER).
- Awardee CAGE, Inspection & Acceptance CAGE, and Facility/Subcontractor CAGE.
- New unit price and delivery lead-time for comparison. An important note specifies a price reduction per unit/per month for failure to meet the required RTAT, with the contractor to propose the amount and maximum. Only authorized distributors of the original manufacturer's item will be considered, and proof of authorization on company letterhead must be submitted with the offer.
Additional Notes
This solicitation's clauses have been updated per a "Revolutionary FAR Overhaul." Freight is FOB Origin, and accelerated delivery is encouraged. Freight handling for assets is managed by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.
- Contact: VALENTINO.P.ARENA.CIV@US.NAVY.MIL