Concrete Foundation Materials

SOL #: FA489726QC033Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4897 366 CONS PKP
MOUNTAIN HOME AFB, ID, 83648-5296, United States

Place of Performance

Mountain Home AFB, ID

NAICS

Construction Sand and Gravel Mining (212321)

PSC

Mineral Construction Materials, Bulk (5610)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 13, 2026
2
Last Updated
Mar 20, 2026
3
Submission Deadline
Mar 24, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting quotes for Concrete Foundation Materials for Mountain Home AFB, ID. This is a 100% Total Small Business Set-Aside acquisition, issued as a Request for Quotation (RFQ) under a combined synopsis/solicitation. The government intends to award a Firm Fixed-Price contract. Quotes are due by 11:00 AM MDT on March 23, 2026.

Scope of Work

This opportunity requires the delivery of various construction materials to Mountain Home AFB, ID. Key requirements include:

  • Aggregate Base Course: 500 U.S. tons of 0.75-inch minus Aggregate Base Course (D-1 Grading).
  • #4 Rock: 410 U.S. tons of #4 Rock Crushed concrete.
  • Concrete: An estimated total of 287 cubic yards of 4500 psi concrete, with specific quantities for:
    • Footer (37 CY)
    • T-Block (68 CY)
    • Cap (27 CY)
    • Interior Slab - Outside Lanes (95 CY)
    • Interior Slab - Inside Lane (48 CY)
    • Ramps (12 CY)
    • Note: Pump truck delivery will be required for Cap, Interior Slab (Outside Lanes), and Interior Slab (Inside Lane) pours. A line truck with a maximum hose distance of 70' and a 2" hose size is sufficient.

Delivery & Logistics

  • Delivery Schedule:
    • Base Course and #4 Rock: Approximately by May 8, 2026.
    • Concrete: Starting on or around May 10, 2026, as needed.
    • General delivery availability: April 15, 2026, through July 31, 2026.
    • Delivery Days/Times: Monday through Friday, 6:00 AM to 6:00 PM MDT.
    • Notice: 48-hour notice required for each delivery.
  • Delivery Location: Mountain Home Air Force Base Property (specific drop-off to be coordinated, Google Maps pin provided in Q&A for reference).
  • Technical Specifications & Submittals: Requires specific tests and documentation for Base Course, #4 Rock, and Concrete, including Sieve Analysis, Proctor Method C, Slump Test, and Air Content, among others.
  • Site Requirements: Includes provisions for site cleanup, incident reporting, security procedures, base access, and operations security (OPSEC).

Contract Details

  • Contract Type: Firm Fixed-Price
  • Period of Performance (Delivery): April 15, 2026, to July 31, 2026
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
  • FOB: Destination
  • Payment Terms: NET 30

Submission & Evaluation

  • Quotes Due: March 23, 2026, by 11:00 AM MDT.
  • Questions Due: March 18, 2026, by 2:00 PM MDT.
  • Submission: Quotes must be emailed to the Contracting Officer and Contracting Specialist. All solicitation amendments must be acknowledged. .zip files are not acceptable.
  • Evaluation Factors: Price and Technical Capability. Technical capability will be assessed based on whether the proposed product meets or exceeds minimum salient characteristics and specifications. Insufficient product data may result in a "Not Acceptable" rating.
  • Eligibility: Offerors must be registered in SAM under NAICS 212321 (SB Size Standard: 500 Employees) prior to award.

Contact Information

People

Points of Contact

Augustus ShinnPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: Mar 20, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 19, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 15, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 13, 2026
View
Concrete Foundation Materials | GovScope