Construct Main Gate Canopy

SOL #: W50S8D26QA011Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7NR USPFO ACTIVITY NYANG 105
NEWBURGH, NY, 12550-5042, United States

Place of Performance

Newburgh, NY

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 29, 2026
2
Last Updated
May 30, 2026
3
Submission Deadline
Jun 5, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting quotes for the Construct Main Gate Canopy project (WHAY202001) at the 105th Airlift Wing, Stewart ANGB, Newburgh, NY. This is a Total Small Business Set-Aside for a Firm Fixed-Price contract. The project aims to install a permanent, all-weather overhead canopy at the Main Gate Entry Control Point. Quotes are due June 05, 2026, at 11:00 AM EST.

Scope of Work

The contractor will furnish all necessary personnel, equipment, tools, materials, supervision, and quality control to construct an overhead canopy structure. This includes excavation, concrete foundations, structural steel, metal roofing, gutters, downspouts, and electrical work. The project also involves modifications to existing perimeter fencing (demolition, removal, installation of new posts, fabric, and gates) and curb realignment with associated site work (grading, concrete pouring, asphalt paving, and pavement markings). All work must strictly adhere to the project design drawings and specifications (Project WHAY202001). Existing gate house and guard shack buildings must remain operational throughout construction.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • NAICS Code: 236220 (Commercial and Institutional Building Construction)
  • Size Standard: $45 million
  • Project Magnitude: Between $250,000 and $500,000
  • Set-Aside: Total Small Business Set-Aside
  • Period of Performance: 180 calendar days from the Notice to Proceed, with work commencing 10 calendar days after NTP.
  • Bonds: Performance and Payment Bonds are required.
  • Wage Determination: The revised General Decision Number NY20260007, Modification Number 2 (dated 05/18/2026) applies, detailing prevailing wage rates for Dutchess, Orange, Sullivan, and Ulster counties in New York.

Submission & Evaluation

  • Quote Submission: Electronic via email to joseph.kugler.1@us.af.mil.
  • Deadline: June 05, 2026, at 11:00 AM EST.
  • Pre-Proposal Conference & Site Visit: May 20, 2026, at 10:00 AM EST at the Civil Engineering Squadron Conference Room, Building # 207, 105th Airlift Wing, Stewart ANGB. Pre-registration is mandatory; instructions are in the SF 1442.
  • Questions Due: Not later than the fifth working day prior to the closing date.
  • Evaluation Factors: Price and Technical Capability (Past Experience and Project Schedule). Award will be made to the lowest priced, technically acceptable quote that conforms to the Statement of Work and meets acceptability standards for non-cost factors.
  • Eligibility: Offerors must be registered in the System for Award Management (SAM.gov) prior to quote submission.

Important Notes

Funds are not presently available, and the award is contingent upon the appropriation of funds. Offerors must acknowledge receipt of Amendment 0001.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 4
Solicitation
Posted: May 30, 2026
View
Version 3
Solicitation
Posted: May 27, 2026
View
Version 2Viewing
Solicitation
Posted: May 20, 2026
Version 1
Solicitation
Posted: Apr 29, 2026
View