Construction of B-21 Radio Frequency (RF) Hangar

SOL #: W912DQ26RA019Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W071 ENDIST KANSAS CITY
KANSAS CITY, MO, 64106-2896, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Airfield Structures (Y1BZ)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 18, 2026
2
Last Updated
Apr 3, 2026
3
Submission Deadline
Jun 15, 2026, 8:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE) Kansas City District (NWK) intends to solicit, negotiate, and award a Firm-Fixed-Price, Design-Bid-Build construction contract for the Construction of a B-21 Radio Frequency (RF) Hangar at Whiteman Air Force Base (WAFB), MO. This opportunity is for a one-time, Unrestricted contract. Proposals are due June 15, 2026.

Scope of Work

The contract requires the construction of a Radio Frequency/Measurements Hangar Facility designed for one aircraft position, along with all associated back shops, material storage, and administrative and facility support spaces. The facility will encompass both unclassified and classified spaces, totaling 5,345 square meters (57,532 square feet).

Key structural features include:

  • A new reinforced concrete foundation, replacing the paved area east of the existing Phase Hangar (Building 9).
  • A metal roof and metal siding panels on steel framing and girts above a masonry cavity wall and Concrete Masonry Unit wall assembly around the base.
  • Powered steel sliding hangar doors.

The project also includes essential supporting facilities such as utilities, pavements, site improvements, and other necessary infrastructure to ensure a complete and usable facility.

Contract & Timeline

  • Type: Unrestricted, Firm-Fixed-Price, Design-Bid-Build construction contract (Solicitation)
  • Set-Aside: None specified
  • Response Due: June 15, 2026, 08:00 AM Z
  • Published: April 2, 2026, 01:48 PM Z

Evaluation

Evaluation criteria are not explicitly detailed in the provided information.

Additional Notes

This is an Unrestricted opportunity. For inquiries, contact the primary point of contact, David Miller, at david.f.miller@usace.army.mil or 816-389-2258. A secondary contact is Michael France at michael.g.france@usace.army.mil.

People

Points of Contact

Files

Files

View
View
View
View
View
View
View
View

Versions

Version 4
Solicitation
Posted: Apr 3, 2026
View
Version 3Viewing
Solicitation
Posted: Apr 2, 2026
Version 2
Solicitation
Posted: Apr 1, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 18, 2026
View
Construction of B-21 Radio Frequency (RF) Hangar | GovScope