CONSTRUCTION OF DORMITORY AT JOINT BASE LANGLEY-EUSTIS, HAMPTON, VA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, through W2SD ENDIST NORFOLK, is soliciting proposals for the construction of a dormitory at Joint Base Langley-Eustis, Hampton, VA. This project aims to house 144 enlisted personnel and includes comprehensive site development and utility infrastructure. Proposals are due by May 14, 2026.
Scope of Work
The project involves constructing a 144-person dormitory, including 12 accessible rooms. Key construction elements include compacted fill, reinforced concrete foundations and floor slabs, structural steel frame, and load-bearing metal studs. The exterior will feature brick facade, precast concrete base, and metal panel/glass storefront. The roof system will combine structural steel, trusses, open web joists, standing seam metal roofing, and low-slope single-ply membrane roofing.
Additional work encompasses long-run outside plant communications, connections to existing utility infrastructure, site preparation, pavements, site improvements, security enhancements, area lighting, and remediation of petroleum-contaminated soil. The facility must meet seismic and wind resistance codes, adhere to Department of Defense Unified Facilities Criteria (UFC) 1-200-01 for general building requirements, and comply with UFC 4-010-01 for anti-terrorism/force protection. This project is subject to Project Labor Agreement requirements.
Contract & Timeline
- Type: Solicitation (Construction of Troop Housing Facilities - Y1FC)
- Set-Aside: None specified
- Response Due: May 14, 2026, 8:00 PM EDT
- Published: March 30, 2026, 8:02 PM EDT
Evaluation
Specific evaluation criteria are not detailed in the provided description.
Additional Notes
For additional information, refer to the attachments. Primary contact is Jacob Coody (jacob.w.coody@usace.army.mil) and secondary contact is Michael Hagerty (michael.hagerty@usace.army.mil).