CONTROL DISPLAY, CD
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP WEAPON SYSTEMS SUPPORT MECH is soliciting quotes for the repair of CONTROL DISPLAY, CD units under solicitation N0010426QDA390001. This opportunity requires a Repair Turnaround Time (RTAT) of 80 days and Government Source Inspection (GSI). Quotes are due by April 13, 2026.
Scope of Work
This Request for Quote (RFQ) is for the repair of CONTROL DISPLAY, CD units. The repaired items must meet the operational and functional requirements specified by CAGE Codes and reference numbers (e.g., 52088 N149001-1; 4DL36 K9349200). All repair work must adhere to the contractor's standard practices, manuals, and directives, including drawings and technical orders. Marking shall be in accordance with MIL-STD-130, REV N. The contractor is responsible for all inspection requirements and maintaining records for 365 days post-delivery.
Contract & Timeline
- Type: Solicitation (RFQ for repair)
- Award Type: Bilateral award, requiring contractor's written acceptance.
- Set-Aside: None specified. Consideration for award will be given only to authorized distributors of the original manufacturer's item; proof is required on company letterhead.
- Response Due: April 13, 2026, 8:30 PM EDT
- Published: March 20, 2026
Key Requirements & Evaluation
Offerors must provide a quote including Unit Price, Total Price, and proposed Repair Turnaround Time (RTAT). The Government seeks an RTAT of 80 days. If this cannot be met, capacity constraints must be provided. A price reduction will be incurred for failure to meet the required RTAT, unless excusable. Government Source Inspection (GSI) is mandatory. Freight is FOB Origin, with accelerated delivery encouraged, and handled by the Navy per the Commercial Asset Visibility (CAV) Statement of Work. Packaging must comply with MIL-STD 2073.
Additional Notes
All questions should be directed to the Point of Contact, ADOLPHE.J.ANDOU.CIV@US.NAVY.MIL or 771-229-0381. Offerors must verify nomenclature, part number, and NSN prior to responding.