CONTROL PANEL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support (WSS) Mechanicsburg, is soliciting quotes for the repair of CONTROL PANELs (CAGE 7Z941, Ref. No. 8501484-1). This is an RFQ for repair services, with a required Repair Turnaround Time (RTAT) of 100 days and Government Source Inspection (GSI). Only authorized distributors of the original manufacturer will be considered. Quotes are due March 27, 2026.
Scope of Work
The contract requires repair and quality assurance for CONTROL PANELs, ensuring they meet operational and functional requirements. All repair work must adhere to the contractor's standard practices, manuals, and directives, including drawings and technical orders. Items must be marked in accordance with MIL-STD-130, REV N. Changes in design, material, servicing, or part number require prior approval, with specific codes for different types of changes. The contractor is responsible for all inspection requirements and must maintain records for 365 days.
Contract & Timeline
- Opportunity Type: Solicitation (RFQ for Repair)
- Award Type: Bilateral contract, potentially Firm-Fixed-Price, Estimated, or Not-to-Exceed (NTE).
- Set-Aside: None
- Response Due: March 27, 2026, 8:30 PM ET
- Published: March 24, 2026
- Product Service Code: 5340 (Hardware)
- TDP Version: Updated from 001 to 003.
Key Requirements & Evaluation
Offerors must provide Unit Price, Total Price, and their proposed RTAT. If the Government's 100-day RTAT is not met, offerors must explain capacity constraints. A price reduction will be incurred for unexcusable delays in RTAT, with offerors required to state their proposed reduction amount per unit/per month, up to a maximum. Quotes should also include T&E fees for Beyond Repair (BR/BER) items. The Government intends to add an option for increased quantity. Freight is FOB Origin, handled by the Navy per the Commercial Asset Visibility (CAV) Statement of Work.
Additional Notes
Accelerated delivery is encouraged. Offerors must provide proof of being an authorized distributor on company letterhead. Packaging shall be in accordance with MIL-STD 2073.