CPF Woodtick Trail FR2107 Repairs
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Forest Service is soliciting quotations for CPF Woodtick Trail FR2107 Repairs within the Chippewa National Forest, Walker Ranger District, Minnesota. This opportunity, issued as an RFQ (12445526Q0062), is a Total Small Business Set-Aside with an estimated project magnitude between $500,000 and $1,000,000. The work involves comprehensive road repair and maintenance services. Quotations are due by May 15, 2026, at 1700 CDT.
Project Scope
The objective is to restore road conditions and extend the lifespan of the Woodtick Trail, addressing damage from heavy rains. Key activities include:
- Roadway Reconditioning: 13.2 miles of roadbed and shoulder reconditioning, 2,500 linear feet of ditch reconditioning.
- Spot Graveling: Placement and compaction of 2,500 cubic yards of Class 1 gravel.
- Culvert Installation: Furnishing and installing new or resetting existing corrugated metal culverts.
- Beaver Dam Removal: Clearing debris from watercourses.
- Gravel Resurfacing: Shaping, grading, and compacting approximately 4 inches of MnDOT Class 1 gravel (20,250 cubic yards) on the Woodtick Trail and Parking Loops.
- Optional: Contractors may elect to crush or produce aggregate from the Forest Service's Big Rice Gravel Pit.
The project is phased, starting with roadway reconditioning, culverts, and beaver dam removal, followed by spot graveling, and concluding with resurfacing.
Contract Details
- Contract Type: Firm Fixed Price Purchase Order.
- Set-Aside: Total Small Business (NAICS 237310, $45M size standard).
- Magnitude: Between $500,000 and $1,000,000.
- Period of Performance: Work must be completed within 120 days of the Notice to Proceed, with an estimated performance window from June 6, 2026, through October 21, 2026 (dates are estimates and may change).
- Place of Performance: Woodtick Trail, Walker Ranger District, Chippewa National Forest, MN. The Big Rice Gravel Pit is near Remer, MN.
Submission & Evaluation
- Quotations Due: May 15, 2026, by 1700 CDT.
- Evaluation Criteria: Award will be made to the responsive, responsible vendor offering the lowest price to the Government.
- Submission Requirements: Quotes must include a Cover Page, completed SF 1442, a Price Volume (including the fillable Schedule of Items (Att. 3) and Basis of Estimate), and a Bid Guarantee (refer to Provision 52.228-1).
- Wage Requirements: Subject to the Davis-Bacon Act Wage Determination (Att. 2) for heavy and highway construction in specified Minnesota counties.
Important Notes
Bidders are strongly urged to inspect the work sites, as no formal site visit will be held. The contractor is responsible for obtaining all required permits, including a minerals permit for prospecting within the Big Rice Gravel Pit if aggregate crushing is chosen. One individual may concurrently serve as Superintendent, SSHO, and QC Manager. Density testing is not required; compaction will be verified by the Contracting Officer's Representative (COR).
Point of Contact: Matthew (Matt) Killian, Contracting Officer, at matthew.killian@usda.gov.