Cut Log Removal - Bird/Animal Strike Hazard (BASH)

SOL #: W50S85-26-Q-A006Award Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7NF USPFO ACTIVITY MIANG 127
SELFRIDGE ANGB, MI, 48045-5213, United States

Place of Performance

Selfridge ANGB, MI

NAICS

Logging (113310)

PSC

Other Range/Forest Improvements Services (Non Construction) (F018)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 25, 2026
2
Last Updated
May 1, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

This SAM.gov entry is categorized as an Award Notice for the Cut Log Removal - Bird/Animal Strike Hazard (BASH) opportunity. However, the provided documents detail a Total Small Business Set-Aside solicitation (W50S8526QA006) for log removal services at Selfridge Air National Guard Base (SANGB), MI. The solicitation sought proposals for services to mitigate Bird/Wildlife Aircraft Strike Hazard (BASH) concerns by removing log piles resulting from previous tree cuttings. The original offer due date was March 20, 2026, at 12:00 PM EST.

Purpose & Scope of Work

The objective was to procure services for the removal of cut and stacked logs from designated areas within SANGB, Michigan. This effort aimed to support aircraft safety requirements and reduce BASH risks. The scope included providing all necessary personnel, equipment, tools, materials, supervision, and quality control to lawfully remove and dispose of logs. Contractors were also required to ensure drainage ditches were clear and obstacle-free to prevent ponding that attracts wildlife, comply with all federal, state, and local regulations (wetland protection, soil erosion, waste disposal), and restore disturbed ground surfaces to pre-work condition. Burning was not an authorized disposal method.

Key Requirements & Deliverables

  • Log Removal Service: Removal and lawful disposal of cut and stacked logs from identified locations (detailed in Technical Exhibit 3, "Map of Log Piles for Removal").
  • Drainage Maintenance: Ensure drainage ditches are clear and obstacle-free.
  • Site Restoration: Restore all disturbed ground surfaces to 95% of their pre-work condition.
  • Compliance: Adherence to all federal, state, and local regulations, including those for Hazardous Materials (HM) handling and environmental/safety standards (OSHA).

Contract Details

  • Solicitation Number: W50S8526QA006
  • Contract Type: Firm Fixed Price
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 113310 (Forestry and Logging)
  • Size Standard: 500 employees
  • Product Service Code: F018 (Other Range/Forest Improvements Services (Non Construction))
  • Period of Performance: July 1, 2026, to December 28, 2026 (180 days from contract award).
  • Funding: Contingent upon the availability of appropriated funds.
  • Place of Performance: Selfridge ANGB, MI 48045.

Submission & Evaluation

  • Offer Due Date: March 20, 2026, at 12:00 PM EST.
  • Submission Method: Bids were accepted via email to katherine.sutton.4@us.af.mil.
  • Evaluation Factors: Price, past performance, and technical aspects were considered equally significant. Offers were evaluated by adding the total price for all options to the total price for the basic requirement.

Special Requirements & Notes

  • Site Visit: A collective site visit was being coordinated, requiring vetting. Bidders were advised to check SAM for updates. Individual walkthroughs were not available.
  • Wage Determination: Wage Determination No. 2015-4867, Revision No. 32, was applicable, outlining minimum wage rates and fringe benefits for Michigan counties (Lapeer, Macomb, Oakland, St Clair). This was critical for labor cost estimation.
  • Personnel: Contractor employees needed to be fully qualified, professional, English fluent, and possess required licenses (commercial/state driver's). AT Level I awareness training was required within 10 days of contract start.
  • Proposal Requirements: Proposals needed to include a practical schedule, a detailed work plan, and a complete list of equipment to be used.
  • Project Nature: This was a new requirement, not an incumbent recompete.

People

Points of Contact

No contacts available

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Award Notice
Posted: May 1, 2026
Version 3
Solicitation
Posted: Mar 5, 2026
View
Version 2
Solicitation
Posted: Mar 4, 2026
View
Version 1
Solicitation
Posted: Feb 25, 2026
View