DEEP CLEAN BARRY BAKER TUNNEL (PRESSURE WASH) SERV

SOL #: 140P8626Q0029Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
PWR GOGA(86000)
SAN FRANCISCO, CA, 94123, United States

Place of Performance

Place of performance not available

NAICS

All Other Support Services (561990)

PSC

Maintenance Of Tunnels And Subsurface Structures (Z1LC)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 24, 2026
2
Submission Deadline
May 11, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), specifically the Golden Gate National Recreation Area (GOGA), has issued a Combined Synopsis/Solicitation (RFQ# 140P8626Q0029) for Deep Clean Baker-Barry Tunnel (Pressure Wash) Services. This is a Total Small Business Set-Aside seeking a single Firm-Fixed-Price contract. The work involves comprehensive cleaning, maintenance, and traffic control for the tunnel. Quotations are due Monday, May 11, 2026, by 3:00 PM (PT).

Scope of Work

The contractor will perform deep cleaning services for the Baker-Barry Tunnel in Sausalito, CA. Key tasks include:

  • Pressure washing tunnel walls and ceiling (approx. 43,000 sq. ft.) using hot water (180-200°F), without cleaning agents or solvents. Silt protection is required at drain inlets.
  • Removing heavy mineral deposits from walls, weep holes, and roadways, and cleaning gutters.
  • Inspecting and cleaning approximately 130 weep holes and wire mesh, with potential replacement for up to 20% of the mesh.
  • Implementing traffic control measures, allowing westbound traffic while detouring eastbound traffic. Work hours are 10 PM to 6 AM.
  • Removing graffiti using biodegradable liquid gel remover.
  • Mobilization and Demobilization.

Contract Details

  • Contract Type: Firm-Fixed-Price
  • Period of Performance: September 1, 2026, to February 28, 2027
  • Set-Aside: 100% Total Small Business Set-Aside
  • NAICS Code: 561990 – All Other Support Services
  • Size Standard: $16.5 million in annual gross receipts
  • Place of Performance: Golden Gate National Recreation Area, Marin County, Marin Headlands - Bunker Road, Sausalito, California.

Submission & Evaluation

  • Questions Due: Tuesday, May 5, 2026, by 3:00 PM (PT)
  • Site Visits: April 29, 2026, at 10:00 AM (PT) and May 4, 2026, at 10:00 AM (PT). RSVP is required.
  • Quotations Due: Monday, May 11, 2026, by 3:00 PM (PT)
  • Submission Method: Electronic Mail to earl-michael_gabriel@ios.doi.gov, referencing RFQ# 140P8626Q0029.
  • Evaluation Factors: Proposals will be evaluated based on:
    1. Technical Capability / Relevant Experience (requiring a specific form for past projects)
    2. Past Performance
    3. Cost/Price
  • Required Attachments: Price Schedule, Statement of Work (SOW), DOL WD SCA, Existing Commitment/Past Performance/Relevant Experience form, and Drawings/Photos/Maps.

Additional Notes

Offerors must be registered in the System for Award Management (SAM). A written solicitation will not be issued. The Department of Labor Wage Determination for Marin County applies.

People

Points of Contact

Gabriel, MichaelPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
DEEP CLEAN BARRY BAKER TUNNEL (PRESSURE WASH) SERV | GovScope