Demolition of Buildings 13140 and 13143 (Thor Dormitories) - VSFB, CA

SOL #: FA461026Q1314Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4610 30 CONS PK
VANDENBERG SFB, CA, 93437-5212, United States

Place of Performance

Lompoc, CA

NAICS

Site Preparation Contractors (238910)

PSC

Demolition Of Buildings (P400)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 21, 2026
2
Submission Deadline
Jun 17, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, 30 CONS PK, is soliciting quotes for the Demolition of Buildings 13140 and 13143 (Thor Dormitories) at Vandenberg Space Force Base, CA. This is a 100% Total Small Business Set-Aside opportunity. The project involves comprehensive demolition, hazardous material abatement, utility termination, and site restoration. Quotes are due by Wednesday, June 17, 2026, at 12:00 PM PDT.

Scope of Work

The contractor shall furnish all necessary labor, materials, equipment, transportation, and supervision for the complete demolition of vacant Building 13140 (Thor Dormitory) and Building 13143 (Mechanical Support Building). This includes:

  • Demolition: Removal of all interior and exterior elements, slabs, sidewalks, roofs, doors, windows, and existing equipment. All equipment supporting B13140 must be removed from B13143.
  • Hazardous Material Abatement: Identification, abatement, and proper disposal of Asbestos Containing Materials (ACM) and Lead-Based Paint (LBP) in compliance with NESHAP, Cal-OSHA, and SBCAPCD regulations. A certified, independent third-party survey for ACM and LBP is required.
  • Utility Termination: Termination and capping of all electrical, water, sewer, gas, and communication lines to 18 inches below grade, requiring coordination with 30 CES/CEIEC Toxics Manager, SLD 30 SC, and American Water. As-built drawings and GIS data are required.
  • Site Restoration: Backfilling, compaction to 90% grade, and hydroseeding of the site, including a one-year warranty period with monthly visits.
  • Special Requirements: Adherence to environmental specifications (e.g., bird non-nesting season August 15 - February 15), obtaining AF Form 103 permits, and providing a Salvage Plan for designated materials.

Contract Details & Timeline

  • Contract Type: Combined Synopsis/Solicitation (RFQ) for commercial services.
  • Set-Aside: 100% Total Small Business Set-Aside (NAICS 238910, size standard $19.0M).
  • Period of Performance: Estimated 240 days, from June 25, 2026, to February 20, 2027.
  • Site Visit: Monday, June 1, 2026, at 9:00 AM PDT. Attendees must register by May 27, 2026, 2:00 PM PDT, by emailing full names, driver's license numbers, emails, and phone numbers to Chase French and Rick Porter. Early arrival at VSFB Visitor Center (7:20 AM - 8:20 AM) is encouraged for visitor passes.
  • Questions Due: Friday, June 5, 2026, at 12:00 PM PDT.
  • Quotes Due: Wednesday, June 17, 2026, at 12:00 PM PDT.

Submission & Evaluation

Offerors must submit a completed Technical Questionnaire (Attachment 4) including CAGE Code, a separate Gantt Schedule, and a detailed line-item estimate (lump sum pricing generally not accepted). Proposals will undergo a sequential, phased evaluation:

  1. Price Ranking: Proposals ranked by Total Evaluated Price.
  2. Technical Capability: Evaluated as "Acceptable" or "Unacceptable" against PWS minimum requirements, covering project phasing, HAZMAT management, utility coordination, and structural demolition/site restoration.
  3. Past Performance: Assessed based on up to five recent and relevant projects (last 5 years) and performance risk, including safety record and quality control. Award will be made to the responsible offeror whose proposal is most advantageous, with Price and Past Performance being approximately equal in importance. All submissions and questions should be emailed to Chase French (chase.french@spaceforce.mil) and Rick Porter (rick.porter.1@spaceforce.mil).

Key Attachments

  • Attachment 1 - Performance Work Statement (PWS): Detailed requirements, performance standards, and deliverables.
  • Attachment 2 - Demolition Site Plans: Specific utility removal instructions and site context.
  • Attachment 4 - Technical Questionnaire: Outlines technical, past performance, and project management evaluation factors.
  • Attachment 6 - SCA WD 2015-5647_Rev27: Wage Determination for Santa Barbara County, critical for labor cost estimation.

People

Points of Contact

Chase FrenchPRIMARY
Rick PorterSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 21, 2026
Demolition of Buildings 13140 and 13143 (Thor Dormitories) - VSFB, CA | GovScope