Dorm Receptacles
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, specifically the 4th CONS SQ CC, is soliciting proposals for the turn-key installation of new electrical circuits and outlets at eight (8) Unaccompanied Military Housing (dormitory) buildings at Seymour Johnson Air Force Base (SJAFB), North Carolina. This is a Total Small Business Set-Aside. An amendment has revised the Statement of Work and extended the response deadline.
Scope of Work
This requirement involves furnishing all labor, materials, and equipment to install sixteen (16) new 20-amp, 120-volt Ground Fault Circuit Interrupter (GFCI) circuits. These circuits will power a total of sixty-four (64) new 15-amp duplex receptacles, with four receptacles per stairwell, specifically in the ground-floor stairwells (East and West ends) of each of the eight dormitories. The new receptacles are intended to provide safe, accessible power for authorized use, primarily serving bike racks. Key materials include 3/4" Schedule 40 PVC conduit, #12 THWN-THHN copper wire, GFCI-compatible weatherproof "in-use" covers, and 20-amp single-pole, bolt-on GFCI circuit breakers compatible with existing Siemens electrical panels. All work and materials must comply with the National Electrical Code (NEC), UFC 3-501-01, and UFC 3-520-01.
Contract & Timeline
- Contract Type: Firm Fixed Price
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Period of Performance: 90 calendar days from the date of award, with each facility to be completed within ten (10) calendar days of commencement.
- Response Due: May 21, 2026, at 10:00 A.M. EDT (extended by Amendment 0001).
- Published Date: May 15, 2026 (Amendment 0001).
- Site Visit: An encouraged site visit was held on May 11, 2026, at 09:00 AM EDT.
Evaluation
Proposals will be evaluated based on Price, Technical Capability, and Past Performance. Technical capability requires documentation and a valid, current state-issued Electrical Contractor license. Past performance requires submission of a "Present and Past Performance Information Form" for up to three relevant contracts.
Special Requirements & Notes
Bidders must acknowledge receipt of Amendment FA480926Q00300001, which revised the Statement of Work and added FAR Clause 52.219-28. The "As-Builts for all Buildings" (Attachment 8) provides a factual record of existing electrical infrastructure. Bidders must comply with base access rules, safety regulations, and insurance requirements. Payment requests and receiving reports must be submitted electronically via Wide Area WorkFlow (WAWF). Wage Determination (Attachment 1) provides minimum wage rates for labor costs.