Douthit Gunnery Complex Fiber Optic Repair

SOL #: W911RX26QA038Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT RILEY
FORT RILEY, KS, 66442-0248, United States

Place of Performance

Fort Riley, KS

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electric Wire, And Power And Distribution Equipment (N061)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 17, 2026
2
Submission Deadline
May 1, 2026, 5:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, MICC-FT Riley, is soliciting proposals for Douthit Gunnery Complex Fiber Optic Repair at Fort Riley, Kansas. This Total Small Business Set-Aside opportunity requires the replacement of in-ground fiber optic cables, including trenching, removal, installation, and backfilling at two specific locations on the Douthit Gunnery Range. The resultant contract will be a Firm-Fixed-Price, non-severable agreement. Proposals are due by May 1, 2026.

Scope of Work

The primary objective is to restore full connectivity to range equipment by replacing existing underground fiber optic cabling. This involves:

  • Decommissioning and removing existing fiber optic cable at two grid locations (approximately 80 meters at the first, 70 meters at the second).
  • Installing new contractor-furnished fiber optic cable in prepared trenches (4-6 feet deep).
  • Backfilling excavated areas.
  • Performing all required terminations and comprehensive testing to certify full operational connectivity.
  • The second location also requires the repair of a junction block and replacement of a 'fan-out kit'. Work must be scheduled to avoid interference with the Gunnery Complex's training season, with service performance potentially required immediately on May 11, 2026, and completed within 14 calendar days from contract award.

Contract Details & Set-Aside

  • Contract Type: Firm-Fixed-Price, non-severable.
  • Period of Performance: May 11, 2026, to September 30, 2026 (overall contract period), with work to be completed within 14 calendar days from award.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Place of Performance: Douthit Gunnery Complex, Fort Riley, KS.

Submission Requirements

Offerors must submit quotes electronically via email to Noah Younger (noah.w.younger.civ@army.mil) by May 1, 2026. Submissions must be in two parts:

  • Part I – Technical Acceptability and Scheduling: Complete and sign 'Douthit Fiber Optic Repair – Salient Characteristics'. Detail ability to start immediately on May 11, 2026, and the required range downtime.
  • Part II – Quote and Pricing: Complete and sign 'Solicitation – W911RX26QA038', including total price in the provided Excel Price Bid Exhibit. Offerors must hold prices firm until June 1, 2026. A mandatory site visit is scheduled for April 27, 2026, at 1300 hrs at Douthit Gunnery Range, Bldg. 9299, Fort Riley, KS. While not mandatory for proposal submission, it is highly recommended.

Evaluation Criteria

Award will be made on a Trade-off Best-Value basis, considering Price, Technical Capability, and Scheduling Ability. Non-price factors (Technical, Scheduling, and Past Performance) combined are considered equally important to price.

  • Technical Capability: Evaluated on an Acceptable/Unacceptable (Pass/Fail) basis, including Management Approach, Staffing, Quality Control (QCP required within 10 days of award), and Staffing. Failure to meet salient characteristics will result in a technically unacceptable rating.
  • Scheduling: Evaluated on demonstrating an effective work scheduling method.
  • Past Performance: Assessed for recency (within 3 years, 6 months documented), relevancy, and quality.

Point of Contact

Noah Younger, noah.w.younger.civ@army.mil, 520-714-8003.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
Douthit Gunnery Complex Fiber Optic Repair | GovScope